Last Updated | 04/25/2023 08:04 AM |
Project Title | Modesto Junior College West Campus -Ansel Adams Tile Walkway Replacement |
Physical Address | View project details and contacts |
City, State (County) | Modesto, CA 95358 (Stanislaus County) |
Category(s) | Education, Heavy and Highway |
Sub-Category(s) | College/University, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development |
Contracting Method | Competitive Bids |
Project Status | Bidding, Construction start expected June 2023 |
Bids Due | View project details and contacts |
Estimated Value | $500,000 [brand] Estimate |
Plans Available from | Copy Center |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Removal of existing quarry tile on the second-floor walkways and walkway walls. The walkways will receive a new concrete walking surface and a premanufactured trench drain system. The walkway walls will be finished with a new cement plaster system to match the existing eastern walkway wall. Decorative railings will be removed and reinstalled. The new cement plaster walkway walls will be painted to match the existing walls. New drain pipes will be core drilled through the existing concrete walls in order to provide drainage from the new trench drain system. To bid on this Project, the Bidder is required to possess at a minimum the following State of California Contractor License and Certification: A California Class A and/ or B contractor's license is required to Bid this contract. The Bidder's license(s) must remain active and in good standing throughout the term of the Contract. A bid bond by an admitted California surety insurer on the form provided by the District in the amount of ten percent (10%) of the total bid price, shall accompany the Bid Form and Proposal, as a guarantee that the Bidder will, within seven (7) days after the date of the Notice of Award, enter into a contract with the District for the performance of the services as stipulated in the bid. The successful Bidder shall be required to furnish a 100% Performance Bond and a 100% Payment Bond if it is awarded the contract for the Work. The successful Bidder may substitute securities for any monies withheld by the District to ensure performance under the Contract, in accordance with the provisions of section 22300 of the Public Contract Code. The Contractor and all Subcontractors under the Contractor shall pay all workers on all work performed pursuant to this Contract not less than the general prevailing rate of per diem wages and the general prevailing rate for holiday and overtime work as determined by the Director of the Department of Industrial Relations, State of California, for the type of work performed and the locality in which the work is to be performed within the boundaries of the District, pursuant to sections 1770 et seq. of the California Labor Code. Prevailing wage rates are also available from the District or on the Internet at: . If this Project is funded in whole or in part with State bond funds, the District and/or its designee will be operating a labor compliance program on this Project pursuant to Labor Code section 1771.7. On March 4, 2022, Governor Gavin Newsom issued Executive Order N-6-22 (EO) regarding sanctions in response to Russia's actions in Ukraine. The EO is located at electronically. As a contractor with the Yosemite Community College District, compliance with this EO is required. This includes, but is not limited to, the federal executive orders identified in the EO, as well as the sanctions identified on the US Department of Treasury. Failure to comply may result in termination of the contract, as applicable. This Project is subject to labor compliance monitoring and enforcement by the Department of Industrial Relations pursuant to Labor Code section 1771.4 and subject to the requirements of Title 8 of the California Code of Regulations. The Contractor and all Subcontractors under the Contractor shall furnish electronic certified payroll records directly to the Labor Commissioner weekly or within (10) days of any request by the District or the Labor Commissioner. The successful bidder shall comply with all requirements of Division 2, Part 7, Chapter 1, of the Labor Code. Pursuant to SB 854, no contractor or subcontractor may be listed on a bid for a public works project (submitted on or after March 1, 2015) unless registered with the Department of Industrial Relations (DIR) and no contractor or subcontractor may be awarded a contract for a public works project (awarded on or before April 1, 2015) unless registered with the DIR per California Labor Code section 1725.5. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. |
||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |