Similar Projects
Health Center - California State University - Stanislaus
New Construction, Infrastructure - 15,600 SF
Conception
$27,773,000 CJ est. value
Turlock, CA 95382

Health Center - California State University - Stanislaus
New Construction, Infrastructure - 15,600 SF
Conception
$27,773,000 CJ est. value
Turlock, CA 95382

Moffett Road / Multi-Residential
New Construction, Infrastructure - 24,500 SF
Design
$10,900,000 CJ est. value
Ceres, CA 95307

Beautification Clean California Project
Infrastructure
Design
$1,250,000 CJ est. value
Ceres, CA 95307

Manila Highway 255 Shared Use Path
Alteration
Post-Bid
$888,055 est. value

Modesto Junior College - West Campus Emergency Exit Road
Infrastructure
Post-Bid
$30,000 est. value
Modesto, CA 95358

General Engineering (A License) Construction, San Joaquin, Stanislaus, and Tuolumne Counties, Hetch Hetchy
Infrastructure, Alteration
Results
$5,000,000 est. value
San Joaquin, CA 93660

Curb Ramp Improvements at Paradise Road and Victoria Drive
Infrastructure
Results
Less than $77,000 est. value
Modesto, CA 95351

Lease-Leaseback Construction Services (John Fremont Elementary School Cafeteria and Site Improvement Project) - Modesto City Schools
Renovation, Infrastructure
Construction
$9,200,000 CJ est. value
Modesto, CA 95350

Senior Playground 2014 - 100866 - City of Modesto
Infrastructure, Renovation
Construction
$957,105 CJ est. value
Modesto, CA 95354

Park Villas / Turlock
New Construction, Infrastructure
Pending Verification
$30,000,000 CJ est. value
Turlock, CA 95382

Park Villas / Turlock
New Construction, Infrastructure
Pending Verification
$30,000,000 CJ est. value
Turlock, CA 95382

Classroom Building II - California State University - Stanislaus
New Construction, Infrastructure - 75,189 SF
Conception
$80,426,000 CJ est. value
Turlock, CA 95382

Replace Safety Roadside Rest Area
Infrastructure
Design
$8,284,000 CJ est. value
Westley, CA 95363

Highway 33 and Inyo Avenue Intersection Improvements
Infrastructure
Post-Bid
Newman, CA 95360

Last Updated 04/25/2023 08:04 AM
Project Title

Modesto Junior College West Campus -Ansel Adams Tile Walkway Replacement

Physical Address View project details and contacts
City, State (County) Modesto, CA 95358   (Stanislaus County)
Category(s) Education, Heavy and Highway
Sub-Category(s) College/University, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $500,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

Removal of existing quarry tile on the second-floor walkways and walkway walls. The walkways will receive a new concrete walking surface and a premanufactured trench drain system. The walkway walls will be finished with a new cement plaster system to match the existing eastern walkway wall. Decorative railings will be removed and reinstalled. The new cement plaster walkway walls will be painted to match the existing walls. New drain pipes will be core drilled through the existing concrete walls in order to provide drainage from the new trench drain system. To bid on this Project, the Bidder is required to possess at a minimum the following State of California Contractor License and Certification: A California Class A and/ or B contractor's license is required to Bid this contract. The Bidder's license(s) must remain active and in good standing throughout the term of the Contract. A bid bond by an admitted California surety insurer on the form provided by the District in the amount of ten percent (10%) of the total bid price, shall accompany the Bid Form and Proposal, as a guarantee that the Bidder will, within seven (7) days after the date of the Notice of Award, enter into a contract with the District for the performance of the services as stipulated in the bid. The successful Bidder shall be required to furnish a 100% Performance Bond and a 100% Payment Bond if it is awarded the contract for the Work. The successful Bidder may substitute securities for any monies withheld by the District to ensure performance under the Contract, in accordance with the provisions of section 22300 of the Public Contract Code. The Contractor and all Subcontractors under the Contractor shall pay all workers on all work performed pursuant to this Contract not less than the general prevailing rate of per diem wages and the general prevailing rate for holiday and overtime work as determined by the Director of the Department of Industrial Relations, State of California, for the type of work performed and the locality in which the work is to be performed within the boundaries of the District, pursuant to sections 1770 et seq. of the California Labor Code. Prevailing wage rates are also available from the District or on the Internet at: . If this Project is funded in whole or in part with State bond funds, the District and/or its designee will be operating a labor compliance program on this Project pursuant to Labor Code section 1771.7. On March 4, 2022, Governor Gavin Newsom issued Executive Order N-6-22 (EO) regarding sanctions in response to Russia's actions in Ukraine. The EO is located at electronically. As a contractor with the Yosemite Community College District, compliance with this EO is required. This includes, but is not limited to, the federal executive orders identified in the EO, as well as the sanctions identified on the US Department of Treasury. Failure to comply may result in termination of the contract, as applicable. This Project is subject to labor compliance monitoring and enforcement by the Department of Industrial Relations pursuant to Labor Code section 1771.4 and subject to the requirements of Title 8 of the California Code of Regulations. The Contractor and all Subcontractors under the Contractor shall furnish electronic certified payroll records directly to the Labor Commissioner weekly or within (10) days of any request by the District or the Labor Commissioner. The successful bidder shall comply with all requirements of Division 2, Part 7, Chapter 1, of the Labor Code. Pursuant to SB 854, no contractor or subcontractor may be listed on a bid for a public works project (submitted on or after March 1, 2015) unless registered with the Department of Industrial Relations (DIR) and no contractor or subcontractor may be awarded a contract for a public works project (awarded on or before April 1, 2015) unless registered with the DIR per California Labor Code section 1725.5. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 03 - Concrete, Cast-in-Place Concrete, Concrete Finishing, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Specialty Doors and Frames, Entrances, Automatic Entrances, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Acoustical Ceiling Suspension Assemblies, Flooring, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Protective Covers, Flagpoles, Flags and Banners.
Division 11 - Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Soda Fountain Equipment, Coffee and Espresso Equipment, Ice Machines, Cleaning and Disposal Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Broadcast, Theater, and Stage Equipment, Athletic and Recreational Equipment, Athletic Equipment, Play Field Equipment and Structures, Exterior Court Athletic Equipment, Athletic Field Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Rugs and Mats, Office Furniture, Seating, Institutional Furniture, Classroom Furniture, Library Furniture, Book Shelves, Multiple Seating.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Insulation, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Central Heating Equipment, Central Cooling Equipment.
Division 26 - Electrical, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Roadway Lighting, Area Lighting, Flood Lighting, Exterior Athletic Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Call Management, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Access Control, Electronic Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents