Similar Projects
Z--INDE 236306-Replace Chiller Plants/Cooling Towers
Term Contract
Design
$5,000,000 to $10,000,000 est. value
Philadelphia, PA 19106

Air Conditioning Repair Over 50 Tons
Alteration
Bidding
Philadelphia, PA

Automatic Temperature Control Repair
Alteration
Bidding
Philadelphia, PA

BOILER SERVICE/REPAIR AND WATER TREATMENT
Post-Bid
Philadelphia, PA

Design-Bid-Build (DBB), Building 633 River Water Cooling System, Philadelphia Naval Business Center (PNBC), Philadelphia, PA
Post-Bid
$5,000,000 to $10,000,000 est. value
Philadelphia, PA 19092

Machine Chiller Semi-Annual Preventative/Corrective Maintenance for NFPC
Results
Philadelphia, PA 19112

Chillers and Hotwater/Glycol Pipeline Replacement at Northeast Water Pollution Control Plant
Results
$4,000,000 to $5,000,000 est. value
Philadelphia, PA 19137

HVAC & Duct Cleaning and Fiber Lock Sealing
Post-Bid
Philadelphia, PA 19112

HVAC Maintenance/Repairs - Branches and Regionals
Term Contract
Results
Philadelphia, PA

Boiler Replacement
Renovation
Post-Bid
Philadelphia, PA 19151

Uni-Vent and Temperature Control Replacement at John F. Hartranft Elementary School - General
Results
Less than $160,423 est. value
Philadelphia, PA 19133

Computer Room Upgrades - USBC
Post-Bid
Philadelphia, PA 19106

Jefferson Station Fan Replacement - MC
Results
Philadelphia, PA 19107

HVAC and Mechanical Products
Term Contract
Post-Bid

Exhibit Hall AHU 12A and Thru 14A and B Replacements
Results
Philadelphia, PA

Reported 03/31/2022 12:00 AM
Project Title

HVAC/AIR FLOW | Roof Ventilation Installation

Physical Address View project details and contacts
City, State (County) Philadelphia, PA   (Philadelphia County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Request for Quotations
Bids Due View project details and contacts
Estimated Value
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The selected vendor/contractor will provide labor, material, and equipment necessary to install six (6) 24” diameter wind turbine ventilator on the roof of the Boiler House – Building 8.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents