Similar Projects
Scheduled and Emergency Drainage Repairs and Improvements at Various Locations
Bidding
$680,575 est. value

Foster Avenue Revetment Improvement Project
Post-Bid
Less than $800,000 est. value
Marshfield, MA 02050

WSP Culvert Storm Drain and Water Pipe Along with Related Products
Post-Bid
Carver, MA

Concrete Seawall
Results
Less than $1,177,790 est. value
Hull, MA

Duxbury Beach Seawalls Phase I
Results
Less than $4,500,000 est. value
Duxbury, MA

Routine Maintenance and Drain Repairs
Post-Bid
Brockton, MA

West Elm Street Bridge Replacement
Results
Less than $670,000 est. value
Brockton, MA

Scheduled and Emergency Drainage Repairs and Improvements at various Locations
Results
Less than $685,975 est. value

Scheduled and Emergency Drainage Structure Reconstruction and Repairs at Various Locations
Results
Less than $637,000 est. value

Bay Avenue Seawall Repairs and Improvements
Results
Less than $400,000 est. value
Marshfield, MA 02050

Warren Cove Seawall Rehabilitation
Results
Less than $3,500,000 est. value
Plymouth, MA 02360

Egypt-Mann Hill Beach Cobble Berm Reconstruction Project
Results
Less than $1,093,185 est. value
Scituate, MA 02066

Construction of an Infiltration Basin with Vegetated Side Slopes and Site Grading; Soccer Field Parking Lot; Ted Williams Camp
Results
Lakeville, MA 02347

Installation of Catch Basins and Grading Soccer Field Parking Lot at Ted Williams Camp
Results
Lakeville, MA 02347

Tiffany Road Drainage and Pavement Improvements
Results
$900,000 est. value
Norwell, MA 02061

Last Updated 02/27/2021 02:34 AM
Project Title

North Nantasket Beach Dune Restoration and Accessibility

Physical Address View project details and contacts
City, State (County) Hull, MA   (Plymouth County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $170,000
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Dune restoration and accessibility project at North Nantasket Beach. The work includes demolition of existing ramp structure, construction of timber ramp, drainage improvements, coordination with Town for restoration of dune, and all materials, equipment, services and construction inherent to the Work.

Details

Division 02 - Existing Conditions, Demolition.
Division 06 - Wood, Plastics, and Composites.
Division 31 - Earthwork, Erosion and Sedimentation Controls, Earthwork Methods, Driven Piles, Timber Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents