Similar Projects
Berrien High School HVAC Replacement
Renovation
Sub-Bidding
$200,000 CJ est. value
Nashville, GA 31639

HVAC and Mechanical Products
Term Contract
Post-Bid

HVAC and Mechanical Products
Term Contract
Post-Bid

Cobb Hall Outdoor Air Supply
Results
$448,552 est. value
Carrollton, GA 30118

Roof and HVAC Renovations To The Carroll County Magistrate Court Building
Results
Carrollton, GA 30116

HVAC and Mechanical Products and Solutions
Term Contract
Post-Bid

DFCS - HVAC Renovation
Results
Statesboro, GA 30458

Selective Improvements at Four Developments
Alteration
Post-Bid
$350,000 est. value
Metter, GA

Goodyear Clubhouse Renovation - HVAC
Results
Cartersville, GA 30120

HVAC Maintenance
Alteration
Post-Bid
Metter, GA 30439

HVAC Maintenance and Repair Services Annual Contract
Term Contract
Results
Saint Marys, GA 31558

HVAC Replacement for the Macon Housing Authority Central Office
Alteration
Post-Bid
Macon, GA 31201

WGTC Water Heater Replacement
Alteration
Results
$76,383 est. value
Fitzgerald, GA 31750

HVAC Maintenance Contract 2021-2023
Term Contract
Post-Bid
Waynesboro, GA 30830

WGTC Exhaust Fan Replacement
Alteration
Results
$67,678 est. value
Fitzgerald, GA 31750

Last Updated 09/07/2022 10:02 AM
Project Title

MP Arts Chiller Replacement

Physical Address View project details and contacts
City, State (County) Statesboro, GA 30460   (Bulloch County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $400,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

Replace two (2) centrifugal Chillers and modify exterior to accommodate an new double door. The Owner reserves the right in its sole and complete discretion to waive technicalities and informalities. The Owner further reserves the rights in its sole and complete discretion to reject all bids and any bid that is not responsive or that is over the budget. The Owner anticipates that the contract will be awarded to the responsive and responsible bidder who provides the lowest bid within the budget. In judging whether the bidder is responsible, the Owner will consider, but is not limited to, the following: o Whether the bidder or its principals are currently ineligible, debarred, suspended, or otherwise excluded from bidding or contracting by any state or federal agency, department, or authority; o Whether the bidder or its principals have been terminated for cause or are currently in default on a public works contract; o Whether the bidder can demonstrate sufficient cash flow to undertake the project as evidenced by a Current Ratio of 1.0 or higher; o Whether the bidder can demonstrate a commitment to safety with regard to Workers' Compensation by having an Experience Modification Rate (EMR) over the past three years not having exceeded an average of 1.2; and o Whether the bidder's past work provides evidence of an ability to successfully complete public works projects within the established time, quality, or cost, or to comply with the bidder's contract obligations. In the event all responsive and responsible bids are in excess of the budget, the Owner, in its sole and absolute discretion and in addition to rejecting all bids, reserves the right either to supplement the budget or to negotiate with the lowest responsive and responsible bidder (after all accepted deductive alternates are taken) but only for the purpose of making changes to the project that will result in a cost to the Owner that is within the budget, as it may be supplemented.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents