Similar Projects
Summer 2021 Paving / Reclamation Projects
Infrastructure
Post-Bid
White River Junction, VT

Civil and Paving Multiple Award Construction Contract
Term Contract
Post-Bid
Less than $95,000,000 est. value
Camp Lejeune, NC

Hartford-Sharon IM Surf (65) and Hartford-Sharon IM Surf (66)
Results
$5,000,000 to $10,000,000 est. value
Hartford, Sharon, VT

Hartford STP PC21 (4) and Woodstock NH PC21 (5) and Woodstock STP PC21 (3)
Results
$5,000,000 to $10,000,000 est. value
Hartford, Woodstock, VT

South Main, North Main, and Gates Street Utility and Roadway Improvements, Contract No. 2
Infrastructure
Post-Bid
$1,926,000 est. value
Hartford, VT 05001

Hartland-Norwich IM 091-1 (84)
Results
$5,000,000 to $10,000,000 est. value
Hartland, Norwich, VT

Crafco Pavement Repair, Equipment, Supplies, Parts, and Repair Services
Infrastructure
Post-Bid
Montpelier, VT

Retainer Contracts for Asphalt Paving, Sealing & Striping Services Statewide
Term Contract
Results
$500,000 est. value

Boardwalk Construction
Addition, Infrastructure
Post-Bid
$100,000 est. value

2021 Paving
Results
Springfield, VT

Hartland 3 Corners Intersection STP BP19(2)
Infrastructure
Post-Bid
Woodstock, VT

Statewide - Southern Region Stp Crak(42)
Results
$1,000,000 to $2,500,000 est. value

2022 Mill, Shim, and Overlay
Infrastructure
Post-Bid
$1,000,000 est. value
Springfield, VT

Statewide - Northern Region STP CRAK(41)
Results
$1,000,000 to $2,500,000 est. value

2021 Paving
Infrastructure
Results
Weathersfield, VT

Last Updated 04/28/2022 11:33 PM
Project Title

Christian Hill Road Ditching & Culvert Replacement

Physical Address View project details and contacts
City, State (County) Bethel, VT 05032   (Windsor County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $13,400
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Contractors to re-establish ditch lines and replace two (2) culverts. Proposals shall, at a minimum, accomplish the following Minimum Scope of Work: Ditching: 1. Ditch will be excavated deep enough to drain the road base and handle an expected runoff depth of 1.5’ – 2’ deep. 2. Ditch bank side slopes should be a maximum 2:1 horizontal to vertical ratio. 3. Ditch should be at least 2’ wide forming a slightly rounded (parabolic) shape to help slow and disperse water. 4. Outlet the ditch into a vegetated area whenever possible. Culvert Installation: 1. Bottom width of culvert trench should be twice the width of the culvert, with sidewalls no steeper than 1:1. 2. A 0.5% positive slope is the minimum to allow for positive drainage flow. 3. A minimum of 18” to 24” of fill is required over the culvert, with required compaction in 6”lifts. Lifts should be soaked with water to achieve maximum compaction.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents