Similar Projects
Castro Valley Boulevard Corridor Improvements from San Miguel Avenue to Stanton Avenue - Alameda County
Infrastructure
Conception
$1,250,000 est. value
Castro Valley, CA 94546

Sidewalk Repair Project
Alteration
Design
$500,000 to $1,000,000 est. value
Dublin, CA 94568

East Bay Greenway Segment II (Seminary Avenue to 69th Avenue)
Infrastructure, Alteration
Bidding
$3,633,448 est. value
Oakland, CA

Meadowlark Trail
Infrastructure
Post-Bid
$50,000 est. value
Pleasanton, CA

Rapid Corridors San Pablo Avenue Project
Infrastructure
Post-Bid
Oakland, CA 94622

Accessible Improvement Program - Phase 1
Infrastructure
Results
$1,000,000 to $5,000,000 est. value
Oakland, CA

Fruitvale Alive Gap Closure
Infrastructure
Results
$10,908,219 est. value
Oakland, CA 94622

Trip Hazard Removal of Raised Sidewalk
Infrastructure
Post-Bid
Hayward, CA

Install Accessible Pedestrian Signal and Re-Stripe Crosswalks
Infrastructure
Results
$3,660,000 est. value
CA

Annual Street Rehabilitation and Preventive Maintenance Project Fiscal Year 2021 - 2022
Infrastructure
Post-Bid
$1,380,000 est. value
Emeryville, CA 94608

ADA Accessible Entry and Parking at the Diablo Range District Office
Infrastructure
Results
$285,000 est. value
Livermore, CA 94550

Masonic Intersections (Ohlone Trail Safety Improvements)
Infrastructure
Results
$600,000 est. value
Albany, CA 94706

Safe Route for Seniors
Infrastructure
Results
$2,749,160 est. value
Hayward, CA

Construct New Parking Lot
Alteration
Results
$500,000 to $1,000,000 est. value
Dublin, CA 94568

Municipal Parking Lot No 1 Improvement
Infrastructure
Results
$418,000 est. value
Hayward, CA

Reported 07/09/2022 12:00 AM
Project Title

Contractor - Witter Field - Increment 1- Parking Lot Renovations

Physical Address View project details and contacts
City, State (County) Piedmont, CA 94602   (Alameda County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs), Construction Start Expected August 2022
Bids Due View project details and contacts
Estimated Value $400,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Witter Field- Increment 1- Parking Lot Renovations Scope of Work- PUSD desires to have an existing parking lot renovated to install a new ADA parking space and additional storm drainage at Piedmont Unified Witter Field. Interested applicant are required to have extensive experience with storm drain work, paving and grading in a school setting. Please contact Pete Palmer for more information and attend the mandatory walk through.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents