Similar Projects
RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Conception
$1,500,000 CJ est. value
Seattle, WA 98174

Community Center Replacement Dumpster Enclosure
Infrastructure
Design
$170,000 CJ est. value
Fenton, MI 48430

West Winds Condominium (Stony Brook Phase III)
New Construction, Infrastructure
Design
$51,000,000 est. value
Fenton, MI 48430

Resurfacing of Two (2) Basketball Courts
Infrastructure
Bidding
$60,000 est. value
Flint, MI

Lavelle Road Resurfacing From Flushing Road to Pasadena Avenue
Infrastructure
Bidding
$800,000 CJ est. value
Flint, MI 48504

Paving & Site Lighting
Post-Bid

Mason Elementary Asphalt Paving Program
Post-Bid
Grand Blanc, MI 48439

0.22 MI of Road Grade Correction including Hot Mix Asphalt Resurfacing, Drainage, Culvert, Sewer and Pavement Markings
Results
MI

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

Dowdall Elementary - 2022 Bond - Kearsley Community Schools
Addition, Alteration
Design
$1,000,000 est. value
Flint, MI 48506

N. Long Lake Road 8" Sanitary Forcemain Extension
Infrastructure
Bidding
$300,000 CJ est. value
Fenton, MI 48430

Street Sweeping Services
Term Contract
Post-Bid
Flint, MI

19.56 MI of Hot Mix Asphalt Cold Milling and Resurfacing, Full Depth Concrete Pavement Repairs, Joint Repairs and Pavement Markings
Results

Athletic Lighting
Infrastructure
Design
$200,000 CJ est. value
Flint, MI 48502

2022 Pavement Rehab
Infrastructure
Bidding
$900,000 CJ est. value
Burton, MI 48519

Last Updated 08/09/2022 12:04 AM
Project Title

Miller Road Construction Engineering

Physical Address View project details and contacts
City, State (County) Flint, MI 48532   (Genesee County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $500,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

As of December 7, 2021, a design engineer has been awarded. No firm timeline has been established for the construction. *The previous solicitation is listed below for reference …. Please see RFP and additional attachments including additional MDOT/Project specs, Maps, bid sheets and plans. Bid Intent Not Available Question Acceptance Deadline 10/06/2021 12:00 AM EDT Questions are submitted online No Job Location Miller Road, City of Flint Both mail in proposal and electronic submittal must be received by due date and time. The method of Contractor Selection has not been Determined at this time

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents