Similar Projects
Concrete Pavement Rehabilitation - Area 1
Bidding
$2,000,000 to $3,000,000 est. value
Indianapolis, IN 46204

2020 CCMG Resurfacing
Post-Bid
Windfall City, IN

Commerce Parkway, Arvin Road and Hurricane Street Intersection Improvements
Post-Bid
Franklin, IN 46131

Dearborn County Bridge #87
Results
$100,000 est. value
Aurora, IN 47001

Union Center Elementary School Additions & Renovations - 2022
Addition, Demolition, Renovation, Infrastructure
Results
$5,156,852 CJ est. value
Valparaiso, IN 46385

Woods Robinson Briggs
New Construction, Infrastructure - 318,000 SF
Pending Verification
$100,000,000 CJ est. value
Westfield, IN 46074

IN000A IUPUI Campus-Repair Tunnel Top Under Ball Gardens
Post-Bid
Indianapolis, IN 46202

West 96th Place Roadway Extension-Phase 2 and Other Paving
Results
Saint John, IN 46373

Hot Mastic Asphalt (HMA) for Dickinson Road and Rail Road
Post-Bid
Chesterton, IN 46304

IDIQ District Wide Bridge Maintenance
Results

Hardscape Sealcoating
Post-Bid
Lafayette, West Lafayette, IN

Site Improvements at Haley Elementary School
Results
Fort Wayne, IN 46815

Site Improvements and Related Work at Various Locations
Post-Bid
IN

Pavement Replacement, Substructure Repair, Utility Relocate
Results
Richmond, IN 47374

2021 Huntington County Community Crossing
Post-Bid
Huntington, IN

Last Updated 08/23/2022 04:32 PM
Project Title

Bridge 4 Rehabilitation

Physical Address View project details and contacts
City, State (County) Bennington, IN 47011   (Switzerland County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $547,392 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

FILE NUMBER: 21-12002 This project consists of a bid for the construction of a bridge Rehabilitation for bridge 4 on fairview road, and other miscellaneous And related items. After review and award of a contract, the Owner will provide a Notice to Proceed to the Contractor. Contractor will then have 10 working days after said Notice to Proceed to commence construction and 180 days to achieve substantial completion and an additional 30 days to complete all work for this project, for a total of 210 days after issuance of Notice to Proceed to project closeout. Substantial completion date is therefore anticipated to be JANUARY 28, 2023, and final completion date is therefore anticipated to be FEBRUARY 27, 2023, based on a Notice to Proceed and Contract approval by AUGUST 1ST , 2022. Contractor will be assessed $300.00 a day liquidated damages for any work remaining over and above either of the specified contract completion dates. Progress payments may be made on a standard monthly claim basis, with 10% retainage, and said retainage may be held up to three months after the successful completion of this contract. There is no retainage reduction for this project. There is no pre bid conference scheduled for this project. Bids must be submitted on the forms in the Contract Documents and other conditions therein described must be met. Each bid must be enclosed in a sealed envelope, clearly marked SWITZERLAND COUNTY BRIDGE 4 on the face of the envelope and display the name and address of the bidder. Each bid must be accompanied by a Bid Bond or Certified Check in a sum equal to 10% of the amount of the bid unless otherwise specified, and a completed Non-Collusion Affidavit. Bid prices must be firm for a period of ninety (90) days from the bid opening date. Should a successful bidder withdraw his bid, or fail to execute a satisfactory contract within ten (10) days after notice of acceptance of his bid, the owner may declare the Bid Security forfeited as liquidated damages, not as penalty. The successful bidder shall furnish a Performance and Labor and Materials Payment Bond in an amount equal to one hundred percent (100%) of the contract sum with an approved surety company. Said bond shall remain in full force and effect for a period of one (1) year after date of final acceptance of the work. SWITZERLAND COUNTY, reserves the right to accept or reject any bid and to waive any or all formalities.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents