Similar Projects
Demolition of the Former Riverdale Elementary School
Demolition, Infrastructure
Sub-Bidding
$70,000 CJ est. value
Riverdale, GA 30274

Abatement, Demolition and Removal Services
Term Contract, Demolition, Infrastructure
Sub-Bidding
$60,000 CJ est. value
Dunwoody, GA 30338

Asbestos Abatement, Demolition and Debris Removal
Demolition, Term Contract
Post-Bid
GA

Groundwater/Methane Gas Monitoring Services
Alteration
Post-Bid
McDonough, GA

Asbestos Abatement and Building Demolition
Demolition, Alteration
Results
Harlem, GA 30814

Southside Trail (SST) Soil Remediation
Infrastructure
Results
Atlanta, GA

Former Valdosta High School Building Demolition
Demolition, Infrastructure
Construction
$1,521,000 CJ est. value
Valdosta, GA 31602

Campus Wayfinding Signage
Term Contract
Sub-Bidding
College Park, GA 30337

Provide Water Quality Analytical Services
Term Contract
Post-Bid
GA

Asbestos Abatement Services
Alteration
Results
GA

Directional, Identification, Regulatory, Roadway, Temporary Signs, and Signage for Atlanta Hartsfield-Jackson International Airport
Infrastructure
Sub-Bidding
$80,000 CJ est. value
Atlanta, GA 30320

Environmental Support Services
Infrastructure
Post-Bid

Demolition and Asbestos Abatement of Structures at 2123 Parkwood Road
Demolition, Alteration
Results
$10,800 est. value
Snellville, GA 30078

Construction of Building Monument Signs at Multiple Locations
Infrastructure
Sub-Bidding
$200,000 CJ est. value
Lawrenceville, GA 30046

Pre-Demolition Asbestos Survey
Demolition, Infrastructure
Post-Bid
Homerville, GA 31634

Last Updated 12/01/2022 02:15 PM
Project Title

2023 Right-of-Way Mowing Contract

Physical Address View project details and contacts
City, State (County) Pembroke, GA 31321   (Bryan County)
Category(s) Single Trades
Sub-Category(s) Environmental
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Provide maintenance services to include mowing of all areas within the right-of-way as well as trimming vegetation of areas that cannot be reached with conventional tractor mowers. This work will include but is not limited to under and around guardrails, utility structures, sign posts, storm drainage structures, between curbing and ditch slopes, along concrete joints, etc. This work includes maintaining the vegetation on embankments and down slopes as well as medians located within the Right-of-Way. The medians must be mowed using zero tum radius mowers. This scope of work will include (mowing with a boom axe mower) from the edge of the existing road to the right-of-way property line. Typical equipment to perform this work should include tractor mowers, boom axe mowers, riding and push mowers, hand trimmers, edgers, blowers and other hand tools. Use of chemical treatment is not acceptable. Contractor will remove all litter, trash, broken limbs, and twigs immediately prior to each cycle. Contractor shall properly dispose all items the same day - no bags/trash are shall be left overnight. Page 5 All curbs will be trimmed to remove any grass growing over the face of the curb. Grass clippings shall be removed from the roadway and curb upon completion of work. Commencement and Completions Work shall begin on March 1, 2023 and with the final cycle beginning on November 1, 2023.

Details

Division 01 - General Requirements, Special Procedures, Environmental Procedures.
Division 02 - Existing Conditions, Environmental Assessment, Hazardous Material Assessment, Site Remediation, Asbestos Remediation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents