Similar Projects
Brickyard Solar
New Construction, Infrastructure
Conception
$215,600,000 CJ est. value
Zionsville, IN 46077

Project Green
New Construction, Infrastructure - 673,000 SF
Conception
$361,000,000 CJ est. value
Fort Wayne, IN 46809

Tiburon/Livingston Lakes Extended
New Construction, Infrastructure
Design
Fort Wayne, IN 46818

Bud Meeks Lift Station Improvements 2022
Renovation
Design
$285,000 CJ est. value
Fort Wayne, IN 46802

Intersection Improvement With New Signals
Infrastructure
Bidding
$1,001,799 CJ est. value
Columbus, IN 47201

Small Structures and Drains Construction
Infrastructure
Bidding
$1,370,642 CJ est. value
Fowler, IN 47944

RFQ - Franke Park Renaissance Project Phase 1
Renovation, Infrastructure
Sub-Bidding
$16,755,000 CJ est. value
Fort Wayne, IN 46808

BP#2 - Rebid BC 2 & 3: Site Improvements to: Parkside Elementary School
Renovation, Infrastructure
Sub-Bidding
$730,000 CJ est. value
Columbus, IN 47203

2021 Pavement and Site Improvements
Infrastructure
Post-Bid
Fort Wayne, IN

On-Call Construction Services
Infrastructure
Post-Bid
Fort Wayne, IN

Tillman/Calhoun Lift Station improvements
Results
Fort Wayne, IN

Demolition and Lot Restoration for Neighborhood Code
Infrastructure
Results
Fort Wayne, IN

Scooter's Coffee / Decatur
New Construction, Infrastructure - 664 SF
Construction
$200,000 CJ est. value
Decatur, IN 46733

Parkside Elementary School Bid Package 2 - Renovations and Site Improvements
Renovation, Infrastructure
Construction
$16,000,000 CJ est. value
Columbus, IN 47203

2022 Bond Lebanon Community School Corporation
New Construction, Infrastructure
Pending Verification
$5,600,000 CJ est. value
Lebanon, IN 46052

Last Updated 01/09/2023 09:02 AM
Project Title

Orphan Wells - Grant, Miami, Wabash Howard, and Tipton Counties

Physical Address View project details and contacts
City, State (County) Marion, IN 46952   (Grant County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status Results, Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $476,980 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Scope- plug 8 wells. 1. Alternate 1 Bid includes plugging 5 additional wells. 2. Alternate 2 Bid includes plugging 5 additional wells A. Clear Site of all refuse & trash B. Drain & backfill all excavations; level surface to its original contours. C. Remove equipment, materials and above ground flow lines. All cut off flowlines must be capped. D. Remove all buildings, power lines & poles, concrete pads, contaminated soil and waste. E. Restore the surface as nearly as practicable to its condition before drilling. Minority Contractors are encouraged to submit bids on this project as a prime contractor or through a prime contractor. Bids shall be taken from Prime Contractors pre-qualified by the Public Works Certification Board in the following classification(s): 1799.06 Oil Well Services The Specified construction period is 710 calendar days. The State of Indiana reserves the right to reject any and all bids. Projected Goal of 7% MBE, 5% WBE and 3% IVOSB. Description of project for bid: This project includes the plugging, and abandonment of oil, gas, or class II injection wells and all associated tank sites located in Grant, Miami, Wabash, Howard and Tipton Counties, IN. This includes removal of all equipment associated with the wells and site leveling and restoration to predrilling conditions. This project does not require any long-term soil or ground water remedial actions be taken. The work consists of plugging the wells according to the approved "Well Plugging Plans" that are required to be prepared by the contractor based on the construction of the well from what our records show using plugging rules under 312 IAC 29-33 and including requirements for plugging and abandoning wells for oil and gas purposes under IC 14-37. The Contractor shall furnish all labor, supervision, materials and equipment necessary to complete the project to include landowner notification, plugging plan creation, plugging, site restoration, and filling out well plugging reports to include all documentation required with reports. All required forms and reports are in exhibit A.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents