Similar Projects
Cabell County Career Technology Center Construction
New Construction
Conception
Huntington, WV

Regional Student Support Center Construction
New Construction
Conception
$14,160,000 est. value
Charles Town, WV

Z--Refurbish 4 USGS Research Labs
Renovation
Design
$250,000 to $500,000 est. value
Kearneysville, WV 25430

New Spencer Middle School
New Construction - 56,300 SF
Design
Spencer, WV

Tech Biology Lab Renovation
Renovation
Bidding
$325,000 est. value
Beckley, WV 25801

Carbon Storage Assurance Facility Enterprise (CarbonSAFE) Phase II - Storage Complex Feasibility
New Construction
Bidding
Morgantown, WV

Storage Buildings
New Construction
Post-Bid
New Cumberland, Weirton, WV 26047

Meadow Bridge Regional School
Renovation
Post-Bid
Fayetteville, Meadow Bridge, WV 25976

PE Building ADA Access and Related Construction
New Construction
Results
Romney, WV 26757

Campus Wide Access Safety and Related Construction
New Construction
Results
$285,000 est. value
Romney, WV 26757

Central High School
New Construction
Conception
$61,000,000 est. value
Charles Town, WV

Milton Middle School Construction
New Construction
Design
Huntington, WV

Parkersburg South High School Courtyard Project
New Construction
Bidding
$125,000 est. value
Parkersburg, WV 26101

Meadow Bridge School Health Base
Renovation
Post-Bid
Meadow Bridge, WV 25976

Bridgeport High School Press Box and Weight Room Renovations
Renovation
Results
Clarksburg, WV

Last Updated 05/16/2022 08:29 AM
Project Title

Woodrow Wilson High School Lab Renovations

Physical Address View project details and contacts
City, State (County) Beckley, WV 25801   (Raleigh County)
Category(s) Education, Laboratory
Sub-Category(s) Laboratory, Middle/Senior High School
Contracting Method Competitive Bids.
Project Status Results, All Bids Rejected
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Renovation of several existing classrooms and science laboratory classrooms covering approximately 16,000 sf, located in two separate wings in the school. The project consists of the non-structural interior renovation located on the second floor of C and D Wings. The work includes, but is not limited to, selective demolition; new mechanical piping including plumbing water, sanitary drain lines, gas piping, and electrical power re-distribution; new lighting and lighting controls; and relocation of existing fire alarm devices to accommodate design. New construction is non-combustible metal stud framing with type “X” abuse resistant gypsum board and masonry. Work will also include new classroom hollow metal entry door systems, interior window systems and specialty fixed science casework. Commercial kitchen equipment, appliances, and residential grade appliances, along with art lab specialty equipment will also be included in the project. Finish work will include new ceiling tiles, painted walls and frames, and tile floor patching and repair. Detailed schedule development and coordination of demolition work, piping and other utility work and general construction in the lab classrooms will be required. The scope of the work will be broken into two separate bids. The bidder may choose to bid either portion of the work or both. Bid A will be for the general construction and includes all work, other than the specialty casework, including demolition, general construction, mechanical, electrical, and plumbing work and all scheduling and coordination of the work. Bid B will include the specialty lab casework and chemistry lab tables as shown in the documents and installation thereof.

Details

Laboratory, Renovation, Middle/Senior High School, Approximately 16,000 SF Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents