Similar Projects
Auto Glass Replacement
Term Contract
Post-Bid
Waterford, MI 48328

Window Removal and Replacement-District 4 Office and Stockroom
Post-Bid
Waterford, MI 48328

Repairs to Davisburg Garage Overhead Door Area
Results
Less than $17,250 est. value
Davisburg, MI 48350

2020 Removal and Installation of PD Steel Rolling Garage Doors
Results
Wixom, MI 48393

Birmingham Museum-Allen House Historic Window Restoration Project
Post-Bid
Birmingham, Bridgman, MI 48009

Replacement Windows - Department of Public Works
Results
Troy, MI 48085

District Wide Door Hardware Replacement Phase 2
Post-Bid
Holly, MI

Overhead Door Systems
Results
Troy, MI

Novi Gardenbrook Building (Old Wash Collage) Bid Package #7
Post-Bid
Novi, MI 48375

Exterior Doors and Windows Replacement Pontiac Middle School
Results
Pontiac, MI 48340

Automatic Entry Door Replacement - West Bloomfield Library
Alteration
Post-Bid
West Bloomfield, MI

Entry Door Replacement - Community Center
Results
Auburn Hills, MI 48326

Door Replacement Project
Alteration
Post-Bid
Clawson, MI

Door Hardware
Results
Rochester, MI 48309

PHS Infrastructure Upgrades - Lockers D-Wing
Alteration
Post-Bid
Pontiac, MI

Reported 01/05/2022 11:03 AM
Project Title

Replace Windows 205 West Livingston

Physical Address View project details and contacts
City, State (County) Highland, MI 48357   (Oakland County)
Category(s) Single Trades
Sub-Category(s) Windows/Doors
Contracting Method Competitive Bids.
Project Status Project Delayed
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Two windows on the south side, five on the East, and three on the West. -Remove existing 5" wood trim from around the exterior of each opening and discard. -Remove sashes of windows and discard. Clean frame opening of window slides and leave window frame. New window will sit inside of old frame to keep from disturbing interior extension jambs and casing. -Install two new mulled double hung windows per opening with the following- -HP2+ Energy Star Glass -Dark Bronze aluminum clad exterior/ unfinished interior -Bronze Hardware -Butt new windows up to existing extension jambs. -Install insulation between old and new frames where applicable. -Install new smooth 1"x6" around the perimeter of the windows, caulk, and paint to match. -South side box out will need additional 1"x6" replacement (appx. 20'). Due to rot -Stain interior of windows to a best match to existing stain. -Haul away all debris

Details

Division 08 - Openings, Doors and Frames, Windows.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents