Similar Projects
Ventilation Improvements at the Fort Mchenry Tunnel
Post-Bid
$30,000,001 to $50,000,000 est. value
MD 21224

HVAC Maintenance and Repair at Cheltenham Youth Center
Post-Bid
Cheltenham, MD 20623

Replace Hot Water Heater at Maus Warfield Memorial USAR Center in Rockville, MD 20851
Results
Less than $25,000 est. value
Rockville, MD 20851

Portable Air Conditioning Preventative Maintenance and Repairs
Results
Berwyn Heights, MD 20740

Air Conditioning Repair Services for Buses
Post-Bid
Annapolis, MD 21401

Modify Roof Exhaust Stacks and Attic Exhaust Ductwork in Building 560
Results
Frederick, MD

HVAC Unit Removal and Installation
Post-Bid
Pikesville, MD

Glassmanor Elementary School - Building Envelope and Central HVAC Conversion
Results
$3,000,000 est. value
Upper Marlboro, MD 20745

HVAC Maintenance and Service for SHA in Westminster and Satellite Locations
Post-Bid
Less than $50,000 est. value
Westminster, MD 21157

Construction - Install 1 - Tone Split AC Unit
Results
Fort Meade, MD

HVAC Maintenance and Repair Services
Post-Bid
Less than $50,000 est. value
Rosedale, MD 21237

HVAC Repair and Upgrade at William S. Baer #301
Results
Baltimore, MD 21216

College Center Cooling Tower Replacement
Post-Bid
Cumberland, MD 21502

Comprehensive Operations and Management and HVAC Maintenance for State Center Utility Plant
Term Contract
Results
Baltimore, MD 21201

Eastern Technical High School Air Conditioning Project
Post-Bid
Essex, MD 21221

Last Updated 12/30/2020 04:06 PM
Project Title

Town Hall HVAC Upgrade

Physical Address View project details and contacts
City, State (County) Munster, IN 46321   (Lake County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $400,000 to $500,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The renovation and upgrade will consist of the removal of the existing air handler, the (48) terminal units and the BAS. The hot water plant and associated cabinet and unit heaters shall remain with the exception of the terminal unit hydronic heating coils which shall be removed. Anew air handler and new terminal units with hydronic heating coils shall be installed. All new equip-ment shall be of similar size and capacity to the existing equipment to be removed. A new BAS designed to control and monitor the hot water plant for the Munster Town Hall and Munster Police Department as well as all HVAC equipment for Munster Town Hall and the Munster Police Department shall be provided.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents