Similar Projects
I-5, Mounts Rd To Steilacoom-Dupont Rd - Corridor Improvements
Infrastructure
Bidding
$165,000,000 to $195,000,000 est. value
WA

ASOG Complex
New Construction, Infrastructure - 71,600 SF
Bidding
$10,000,000 to $25,000,000 est. value
Camp Murray, WA

South Yakima Signal and Safety Improvements
Infrastructure
Post-Bid
Tacoma, WA 98417

20th Street Preservation
Infrastructure
Post-Bid
Fife, WA 98424

SR 167,I-5 to SR 509 - New Expressway
Infrastructure
Results
$325,000,000 to $375,000,000 est. value
WA

Nisqually State Park Maintenance Building Phase 1
New Construction, Infrastructure, Alteration
Results
$1,289,979 est. value
Eatonville, WA 98328

1-5 South 56th Street Interchange ADA Compliance
Infrastructure
Bidding
$978,000 est. value
Tacoma, WA 98417

Puyallup Avenue Transit - Street Improvements
Infrastructure
Results
$100,000 est. value
Tacoma, WA

Cathodic Protection Installation
Infrastructure
Results
$175,000 est. value
Tacoma, WA

Right Abutment Access Road Remidiation
Alteration
Results
$100,000 to $120,000 est. value
Shelton, Tacoma, WA

South 21st and C Street Signal Design
Infrastructure
Results
$50,000 to $70,000 est. value
Tacoma, WA 98417

On-Call Electrical Services for Traffic Control Systems
Term Contract
Results
$350,000 est. value
WA

Transfer Lead Upgrades
Infrastructure
Results
$251,000 est. value
WA

Signalization Installation Lincoln Avenue and Port of Tacoma Road
Infrastructure
Results
$200,000 est. value
Tacoma, WA 98421

CRP 5819 92nd Avenue East/224th Street East
Infrastructure
Results
$2,700,000 to $4,000,000 est. value
Graham, WA 98338

Last Updated 01/26/2022 11:36 PM
Project Title

CRP 5736 Canyon Road East - 400 ft. n/o of 84th St E to 72nd Street East

Physical Address View project details and contacts
City, State (County) WA   (Pierce County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Paving/Reconstruction, Storm/Sewers, Traffic Signalization
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This contract provides for the improvement of Canyon Road East from 400 feet n/o 84th Street East to 72nd Street East. The roadway will be widened to 5-lanes with two through lanes in each direction and a two-way left-turn lane, with paved shoulders, cement concrete traffic curb, gutter, and sidewalk on each side. Improvements also include new traffic signal systems at 80th Street East and 72nd Street East, street lighting, an enclosed drainage system, stormwater treatment and storage facilities, and other work all in accordance with, and as described in, the Plans and Specifications

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Precast Concrete.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.
Division 34 - Transportation, Transportation Signaling and Control Equipment, Roadway Signaling and Control Equipment, Traffic Signals, Traffic Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents