Similar Projects
15th Avenue North to 8th Avenue North Rehabilitation
Bidding
MN

15th Avenue North to 8th Avenue North Rehabilitation
Bidding
MN

Reinforced Manhole Structures
Term Contract
Post-Bid
Minneapolis, MN

2021 Infrastructure Improvements
Post-Bid
$1,500,000 to $2,000,000 est. value
MN

Vincent Avenue North Sanitary and Storm Sewer
Renovation
Results
Minneapolis, MN 55401

Medina Country Club Sewer Rehabilitation
Results
$108,000 est. value
Medina, MN 55340

I-394 I and I Rehabilitation Phase 3
Bidding
Golden Valley, MN

Grandview South Area Street and Utility Improvements Improvement
Post-Bid
$9,000,000 to $10,000,000 est. value
Brooklyn Center, MN

Upgrades of ADA Pedestrian Ramps
Results
Minneapolis, MN 55401

City Wide Bike Lane and Laurel Avenue Mill and Overlay
Bidding
$1,350,000 est. value
Golden Valley, MN 55416

Fernbrook Lane/Territorial Road
Post-Bid
Maple Grove, MN 55311

Pond and Storm Sewer Maintenance
Results
Bloomington, Minneapolis, MN

2021 Utility Reconstruction
Bidding
Crystal, MN

CSAH 2 (Penn) Reconstruction at Northpoint
Post-Bid
MN

2020 Sewer Lining
Results
Osseo, MN

Last Updated 03/30/2021 02:28 PM
Project Title

28th Avenue and East Old Shakopee Road Sanitary Sewer Capacity Improvement

Physical Address View project details and contacts
City, State (County) Bloomington, MN 55438   (Hennepin County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Sanitary Sewers, Sidewalks/Parking Lot, Storm/Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Approximately 2500 cubic yards of common excavation, 2. Approximately 3500 tons of bituminous plant mixture, 3. Approximately 4500 cubic yards of Class 5 aggregate base, 4. Approximately 700 linear feet of concrete curb and gutter, 5. Approximately 4500 square feet of 4” to 8” concrete walk, 5. Approximately 2500 linear feet of 8” to 30” sanitary sewer, 6. Approximately 600 linear feet of 24” to 27” sanitary sewer (trenchless), 7. Approximately 400 linear feet of 15” to 24” storm sewer

Details

Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents