Similar Projects
Holmes Street Multi Residential Development
Demolition, New Construction, Infrastructure
Design
$2,000,000 CJ est. value
North Quincy, MA 02171

Holmes Street Multi Residential Development
Demolition, New Construction, Infrastructure
Design
$2,000,000 CJ est. value
North Quincy, MA 02171

John D. Hardy Elementary School / Wellesley
Demolition, LEED Certification, New Construction, Infrastructure - 81,390 SF
Post-Bid
$57,300,000 CJ est. value
Wellesley, MA 02482

On Call Parking and Paving (CR)
Post-Bid
$25,000,000 est. value
Boston, MA

Replacement and Rehabilitation of Water and Sewer Pipes
Infrastructure
Results
Boston, MA

System-Wide Hydrant Replacement
Alteration
Results
$400,000 est. value
Boston, MA

Maple Street Solar
New Construction
Construction
Less than $1,791,080 est. value
Bellingham, MA

Gillette Stadium Renovation
Addition, Renovation, Infrastructure
Construction
$225,000,000 CJ est. value
Foxborough, MA 02035

Massapoag Street Residential Subdivision
New Construction, Infrastructure
Pending Verification
$3,000,000 CJ est. value
S Weymouth, MA 02190

Factory Square Redevelopment
New Construction, Infrastructure
Pending Verification
$5,000,000 CJ est. value
Franklin, MA 02038

Bennett Lane Multi Residential Development
Demolition, New Construction, Infrastructure
Design
$19,000,000 CJ est. value
Quincy, MA 02169

Excavation for Identification of Water Services
Post-Bid
$1,230,142 est. value
Boston, MA

Sidewalk and ADA Improvements And Related Work Including Signals At Various Locations
Infrastructure
Results

Construct a New Approximately 21,700 Sf Fire Headquarters and Renovate 2,500 Sf of the Former Headquarters Building - GC
New Construction, Renovation, Infrastructure - 21,700 SF
Construction
$16,017,000 CJ est. value
Milton, MA 02186

Edison Street Subdivision Expansion
New Construction, Infrastructure
Pending Verification
$1,500,000 CJ est. value
Weymouth, MA 02188

Last Updated 05/10/2023 03:38 PM
Project Title

Walnut Street Reconstruction Project

Physical Address View project details and contacts
City, State (County) Wellesley Hills, MA 02481   (Norfolk County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected June 2022
Bids Due View project details and contacts
Estimated Value $2,437,007 [brand] Estimate
Plans Available from Civil Engineer - 04/14/22
Owner View project details and contacts
Architect View project details and contacts
Description

**As of May 19, 2022, this project has been awarded to J.H. Lynch & Sons and the awarded amount is $2,437,007.22** Walnut Street Reconstruction Project. Road reconstruction of Walnut Street from Washington St to the Newton City line (4,400 feet). Road milling, paving, curbing, sidewalks and drainage work. Prequalification by MassDOT for "Highway Construction" required. Contractor Qualification Highway Division Required for DCAMM contracts over $150,000, Highway Division contracts over $50,000. Find your local number: https://us02web.zoom.us/u/kenqvshDfD

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents