Similar Projects
Bristol Yarn Mill Redevelopment
New Construction, Infrastructure - 6,300 SF
Pending Verification
$57,000,000 CJ est. value
Bristol, RI 02809

Road Resurfacing Project
Infrastructure
Post-Bid
$600,000 est. value
Bristol, RI

Bristol Self Storage
New Construction, Infrastructure - 86,892 SF
Design
$9,000,000 CJ est. value
Bristol, RI 02809

Jamiel Memorial Park Rink Repair
Infrastructure
Post-Bid
$225,000 CJ est. value
Warren, RI 02885

Jamiel Park Softball Field Renovation
Infrastructure
Post-Bid
$400,000 CJ est. value
Warren, RI 02885

Roger Williams University Master Plan
New Construction, Infrastructure
Conception
$40,000,000 CJ est. value
Bristol, RI 02809

Roger Williams University Master Plan
New Construction, Infrastructure
Conception
$40,000,000 CJ est. value
Bristol, RI 02809

Water Street Mixed-Use Building
Demolition, New Construction, Infrastructure - 17,605 SF
Design
$5,000,000 CJ est. value
Warren, RI 02885

Chipotle / Barrington
Demolition, New Construction, Infrastructure
Design
$1,000,000 CJ est. value
Barrington, RI 02806

Chipotle / Barrington
Demolition, New Construction, Infrastructure
Design
$1,000,000 CJ est. value
Barrington, RI 02806

Roadway Resurfacing
Infrastructure
Post-Bid
$1,000,000 CJ est. value
Barrington, RI 02806

Roadway Resurfacing
Infrastructure
Post-Bid
$1,000,000 CJ est. value
Barrington, RI 02806

Sewer Collection System Rehabilitation 2023
Infrastructure
Post-Bid
$590,000 CJ est. value
Bristol, RI 02809

Lower and Upper Kickemuit Dam Removals
Infrastructure
Post-Bid
$220,000 CJ est. value
Warren, RI 02885

Legion Way Hockey Rink Surfacing
Infrastructure
Bidding
$30,000 CJ est. value
Barrington, RI 02806

Last Updated 06/28/2023 01:04 PM
Project Title

AutoZone #3648 / Warren - Rebid

Physical Address View project details and contacts
City, State (County) Warren, RI 02885   (Bristol County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Site Development, Vehicle Sales/Service
Contracting Method Bids by Invitation
Project Status Contract Award, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $1,900,000 [brand] Estimate
Plans Available from Selected Bidders
Owner View project details and contacts
Architect View project details and contacts
Description

*This project has been awarded. *The Editorial Content Team has obtained construction timeline information and construction documents directly from AutoZone.

Details

1 Story Above Grade, 7,147 SF.
Division 01 - General Requirements, Construction Facilities, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Forming, Concrete Accessories, Cast-in-Place Concrete, Concrete Finishing.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Metal Frames, Metal Doors, Specialty Doors and Frames, Coiling Doors and Grilles, Overhead Coiling Doors, Entrances and Storefronts, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Plaster and Gypsum Board Assemblies, Supports for Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Resilient Flooring, Carpeting, Acoustic Treatment, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Flagpoles, Flags and Banners.
Division 11 - Equipment, Vehicle Service Equipment, Compressed-Air Vehicle Service Equipment, Vehicle Lubrication Equipment, Tire-Changing Equipment, Vehicle-Washing Equipment.
Division 12 - Furnishings, Office Accessories, Rugs and Mats, Office Furniture, Interior Planters and Artificial Plants.
Division 14 - Conveying Equipment, Vehicle Lifts.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Emergency Plumbing Fixtures, Eyewash Equipment, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution, Central Heating Equipment.
Division 26 - Electrical, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Special Purpose Lighting, Security Lighting, Exterior Lighting, Lighting Poles and Standards.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Voice Communications Messaging.
Division 28 - Electronic Safety and Security, Intrusion Detection, Electronic Surveillance, Fire Detection and Alarm, Fuel-Oil Detection and Alarm.
Division 31 - Earthwork, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Parking Bumpers, Fences and Gates, Irrigation, Planting.
Division 33 - Utilities, Common Work Results for Utilities, Water Utilities, Sanitary Sewerage Utilities.
Division 41 - Material Processing and Handling Equipment, Cranes and Hoists.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents