Similar Projects
The Dansby Tower
New Construction - 1,250,000 SF
Conception
$250,000,000 est. value
Birmingham, AL

Honda
New Construction, Addition
Conception
Tuscaloosa, AL

Campus No. 124
Renovation, Demolition
Design
$10,000,000 est. value
Pelham, AL 35124

Airport Authority Office Expansion
Addition
Design
Birmingham, AL 35212

Mazda Toyota Manufacturing Training Facility
Addition
Bidding
Huntsville, AL 35810

Mazda Toyota Manufacturing Training Facility
Addition
Bidding
Huntsville, AL 35810

New Office Building (Contract D)
New Construction - 1,536 SF
Post-Bid
Irvington, AL 36544

Architectural Services for Interior Renovations of the Board of Dental Examiners of Alabama Building
Renovation
Post-Bid
Less than $200,000 est. value
Birmingham, AL

Hayden Harris Hall Demolition
Demolition - 12,000 SF
Results
Less than $300,000 est. value
Tuscaloosa, AL

Greene County Water Improvements New Office Building 17-178
New Construction
Results
Eutaw, AL

Engineering Design Technologies
Renovation
Construction
$580,000 est. value
Birmingham, AL 35203

Aldi HQ
New Construction - 564,000 SF
Construction
$100,000,000 est. value
Loxley, AL 36551

Guster Law Firm
New Construction, Demolition - 3,800 SF
Pending Verification
$500,000 to $1,000,000 CJ est. value
Birmingham, AL 35208

Cypress Business Park Logistics Subdivision
New Construction
Pending Verification
Mobile, AL 36619

ACDI Business Center
New Construction - 40,537 SF
Design
$5,000,000 to $10,000,000 CJ est. value
Auburn, AL 36832

Last Updated 12/10/2021 09:05 AM
Project Title

Pecan Building Phase I - East Wing Office Remodel

Physical Address View project details and contacts
City, State (County) Fairhope, AL 36532   (Baldwin County)
Category(s) Commercial
Sub-Category(s) Office
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $293,232
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work is to remodel approximately 3,600 square-feet of enclosed, heated and cooled existing office space contained within the Eastern Wing of the City’s Pecan St Building located at 451 Pecan Avenue, Fairhope, Alabama. This project involves no building envelope or structural work other than the installation of a new exterior egress door. The project does entail demolition, mechanical (minimal), electrical, plumbing, interior non-load bearing wall framing, flooring, wall sheathing, ceiling, tile, cabinetry, fit, finishes and similar building construction/remodel work tasks. All work is within an enclosed, weather-tight, heated and cooled structure, weather or available daylight will have no impact on contractor’s ability to work.

Details

Office, 3,600 SF Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 12 - Furnishings, Bath Furnishings.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents