Similar Projects
Fy22 Buffalo North Breakwater Repair
Infrastructure
Design
Buffalo, NY 14203

Rehabilitation or Replacement of Culverts - 2020 Miscellaneous Culvert Group
Post-Bid
Hamburg, NY

Stair/Plaza Reconstruction and Related Work - Riverside High School
Infrastructure
Post-Bid
Buffalo, NY 14207

West Girard Curb and Drainage Improvement
Results
Kenmore, NY 14217

Thurston Avenue Drainage
Results
Hamburg, NY 14075

Stair/Plaza Reconstruction and Related Work - Bennett High School
Infrastructure
Post-Bid
Buffalo, NY 14214

Slide Remediation at Ketchum Road (CR51)
Results
NY

Regional Drainage and Culvert Cleaning (Statewide)
Term Contract, Infrastructure
Post-Bid

Rehabilitation of East and West Road
Results
West Seneca, NY 14224

Cured-In-Place Pipelining - Term Construction Contract 7
Results

Emerald Shiner Fish Passageway
Results
$1,000,000 to $5,000,000 est. value
Buffalo, NY

West River Shoreline Habitat Restoration
Infrastructure
Results
$625,316 to $859,809 est. value
Grand Island, NY 14072

Elm Street Drainage Replacement
Infrastructure
Results
$475,130 est. value
Alden, NY 14004

Reclamation Embankment Restoration Project
Infrastructure
Results
Depew, NY

Large and Small Culvert Repairs and Replacements
Infrastructure
Results

Last Updated 04/19/2022 07:12 AM
Project Title

Relining of 3 Culverts

Physical Address View project details and contacts
City, State (County) Lancaster, NY   (Erie County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Relining of 3 Culverts in the Town of Lancaster. Harewood Run Over North Tributary of Slate Bottom Creek, Sugarbush Lane Over North Tributary of Slate Bottom Creek, Running Brook Drive Over North Tributary of Slate Bottom Creek. Relining of 3 sets of 3 culverts in the Town of Lancaster with polyurea liner. Work includes cleaning of the culvert, preparation of substrate, installation of liner and project cleanup.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Culverts, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents