Similar Projects
Reported | 03/10/2021 12:00 AM |
Project Title | Parking Lot Timber Fence for Parks and Recreation 2021 |
Physical Address | View project details and contacts |
City, State (County) | NY (Albany County) |
Category(s) | Single Trades |
Sub-Category(s) | Fencing |
Contracting Method | Competitive Bids. |
Project Status | Bidding |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | Municipal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | 1. All materials to be incorporated in this fencing project are to be new, unused, industrial grade, pressure treated with galvanized hardware. 2. Refer to the attached photo for parking lot dimensions and rail locations. 3. Refer to the attached photo that shows the existing rail in that section of the park. The new rail and attachment method should match closely with the existing. 4. Pressure treated wood timber posts shall be installed 8’ on center maximum. 5. Pressure treated wood rails shall be installed on to posts with galvanized hardware. 6. Posts to be installed a minimum of 36” below ground surface into well compacted native soil. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |