Similar Projects
Last Updated | 02/16/2022 09:08 AM |
Project Title | Great Smoky Mountains National Park |
Physical Address | View project details and contacts |
City, State (County) | TN (Blount County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Highway Signs/Guardrails/Barriers, Paving/Reconstruction, Sidewalks/Parking Lot |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | Greater than $10,000,000 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Work includes full depth reclamation of Foothills Parkway Sections 8G and 8H mainline, parking areas, and pull-offs; establishing roadside ditches and reconditioning paved waterways; replacing signs and pavement markings; turf establishment of disturbed areas; installing traffic loop detectors; bridge maintenance repairs; removing and resetting stone curb and sidewalk; and relocating ADA accessibility ramps; replacing and repairing drainage structures; deep patch embankment repairs; replacing sections of steel back timber guardrails and other miscellaneous work. |
||||||||
Details |
|
||||||||
Bidder's List | View project details and contacts | ||||||||
Prospective Bidders | View project details and contacts | ||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |