Similar Projects
CSAH 21 Reconstruction and Concrete Paving, Highway 43 to 3.5 Miles NorthWest - SP 085-621-015, CP 2301 - Winona County
Infrastructure
Conception
$4,900,000 CJ est. value
Stockton, MN 55987

CSAH 21 Reconstruction and Concrete Paving, Highway 43 to 3.5 Miles NorthWest - SP 085-621-015, CP 2301 - Winona County
Infrastructure
Conception
$4,900,000 CJ est. value
Stockton, MN 55987

Bridge and Approaches
Infrastructure
Bidding
$600,000 CJ est. value
Elba Township, MN 55972

Bridge and Approaches
Infrastructure
Bidding
$600,000 CJ est. value
Elba Township, MN 55972

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Winona District Wide Paving
Infrastructure
Post-Bid
$500,000 CJ est. value
Winona, MN 55987

2023 South Baker Street Reconstruction Project
Infrastructure
Results
$2,429,908 CJ est. value
Winona, MN 55987

2023 South Baker Street Reconstruction Project
Infrastructure
Results
$2,429,908 CJ est. value
Winona, MN 55987

CSAH 1 Resurfacing and Guardrail Replacement CSAH 12 to Houston County line 6.88 miles - CP 2304 - Winona County
Infrastructure
Conception
$4,210,000 CJ est. value
Stockton, MN 55987

Request for Proposal for Owners Representative Services Winona State University WSU-23-Center for Interdisciplinary Collaboration, Engagement, & Learning
Demolition, New Construction, Infrastructure - 219,000 SF
Bidding
$77,000,000 CJ est. value
Winona, MN 55987

2022 City Street Improvements
Infrastructure
Post-Bid
$520,000 CJ est. value
Goodview, MN 55987

St. Charles Public Schools - St. Charles Elementary Addition and Renovations
Addition, Demolition, Renovation, Infrastructure
Results
$199,150 CJ est. value
Saint Charles, MN 55972

CSAH 5 Overlay, County Road 125 to CSAH 12, 2.1 miles - Winona County
Infrastructure
Conception
$650,000 CJ est. value
Stockton, MN 55987

Westfield Place Apartments
New Construction, Infrastructure - 31,590 SF
Post-Bid
$8,600,000 CJ est. value
Winona, MN 55987

2023 Maintenance Shouldering
Infrastructure
Results
$268,180 CJ est. value
Stockton, MN 55987

Last Updated 02/14/2024 09:36 AM
Project Title

2023 Bituminous Seal Coats

Physical Address View project details and contacts
City, State (County) Winona, MN 55987   (Winona County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $281,962 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Bituminous Seal Coating of Various Roads in the Whitewater, Elba, St Charles, Warren & Wilson Townships in Winona County Including Bituminous Material for Sealcoat and Fog Seal, Fa-2 Class a Aggregate for Sealcoat, Traffic Control and Striping. CSAHs 12 (in Warren & Wilson Townships), 37 (in Elba & St Charles Townships) an 41 (in Whitewater Township) in Winona County Mobilization - 1 Ls; Bituminous Material for Fog Seal - 15,203 Gals; Bituminous Seal Coat (Fa-2 Class a) - 152,038 Sy; Bituminous Material for Seal Coat - 45,611 Gals; Traffic Control - 1 Ls; 4" Solid & Broken Line Paint - 140,289 Lf and Miscellaneous and Appurtenant Items Required for a Complete Project. Bids Must Be Accompanied by a Certified Check Made Payable to the Winona County Highway Department for Five Percent (5%) of the Bid or a Corporate Bond in Favor of the Winona County Auditor in the Amount of Five Percent (5%) of the Bid. The County reserves the right to reject any or all bids received. Site Directions: CSAH 12 - From TH 43 South to TH 43 North CSAH 37 - From CR 115 to CSAH 24 CSAH 41 - From West County Line To North County Line CR 116 - From CSAH 41 East 500'. All work required under this Contract, except maintenance work, shall be completed within 15 working days and shall be completed no later than August 25, 2023. DESCRIPTION This Work consists of furnishing, installing, maintaining, and removing all traffic control devices required to provide safe movement of traffic and pedestrians through the Project at all times from commencement of the Work until Project Acceptance. Maintain roads and pedestrian facilities undergoing improvements in a condition that accommodates public traffic. Do not close roads or pedestrian facilities, except as authorized. The Engineer may modify the requirements for traffic control as deemed necessary. All temporary traffic management must conform to and be installed in accordance with the "Minnesota Manual on Uniform Traffic Control Devices" (MN MUTCD); o the "Minnesota Temporary Traffic Control Field Manual" (Field Manual). SPECIAL PROVISIONS DIVISION S CP 2306 S-4 the "Speed Limits in Work Zones Guidelines"; the "Minnesota Flagging Handbook"; the "MnDOT Standard Signs and Markings Manual"; the Plan; all applicable standard Specifications and Special Provisions. CONTACT INFORMATION Direct questions about this Project, including pre-bid questions, to Troy Drath, Assistant County Engineer at (507)-457-8840 The U.S. Department of Transportation (DOT) operates the above toll free "hotline" Monday through Friday, 8:00 a.m. to 5:00 p.m., eastern time. Anyone with knowledge of possible bid rigging, bidder collusion, or other fraudulent activities should use the "hotline" to report such activities. The "hotline" is part of the DOT's continuing effort to identify and investigate highway construction contract fraud and abuse and is operated under the direction of the DOT Inspector General. All information will be treated confidentially and caller anonymity will be respected.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents