Similar Projects
Replacement Parts for the 69th Street Waste Water Treatment Plant (WWTP) Actuator
Demolition, Renovation, Infrastructure
Sub-Bidding
$240,000 CJ est. value
Houston, TX 77020

Replacement Parts for the 69th Street Waste Water Treatment Plant (WWTP) Actuator
Demolition, Renovation, Infrastructure
Sub-Bidding
$240,000 CJ est. value
Houston, TX 77020

Hi-Flex Audio/Visual Technology Enhancement
Renovation
Post-Bid
$250,000 CJ est. value
Houston, TX 77004

Rack Caging System
Term Contract
Post-Bid
Houston, TX

Walk Thru Metal Detectors (WTMD)
Results

Valve Pre-Purchase
Alteration
Results
TX

Test Kitchen Walk-In Cooler/Freezer
Alteration
Post-Bid
$320,000 est. value
Pasadena, TX

Dish Machine and Turnkey Installation
Alteration
Results
$300,000 est. value
Pasadena, TX

Informal Air Compressors BCT PRT
Alteration
Post-Bid
Houston, TX

Replacement of Two Dock Levelers
Alteration
Post-Bid
Houston, TX 77007

Maintenance Supplies, Equipment and Services
Term Contract
Post-Bid
Waller, TX

Commercial Kitchen Equipment
Alteration
Post-Bid
Galena Park, TX

Interactive Displays
Renovation
Post-Bid
$500,000 CJ est. value
Huffman, TX 77336

Refrigeration Component Replacement and Turnkey Installation
Alteration
Post-Bid
Pasadena, TX

Mosaic, Phase 2 - Building D, E, and F - PEMB and Elevator
Alteration
Post-Bid
$400,000 est. value
Houston, TX 77085

Last Updated 08/07/2023 09:40 PM
Project Title

WS&D to Serve Sheldon Ridge Sec 12

Physical Address View project details and contacts
City, State (County) Houston, TX 77020   (Harris County)
Category(s) Single Trades
Sub-Category(s) Equipment
Contracting Method Competitive Bids
Project Status Results, Construction start expected August 2023
Bids Due View project details and contacts
Estimated Value $2,153,883 [brand] Estimate
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Scope of Work of the Contract Documents includes the following: the construction of utilities to serve a single family residential subdivision Each Bid must be accompanied by a Bid Bond or a certified or cashier's check, acceptable to the Owner, in an amount not less than 5 percent of the total amount Bid, as a guarantee that the successful bidder will enter into the Contract Documents and execute the Bonds on the forms provided and provide the required insurance certificates within seven (7) days after the date Contract Documents are received by the Contractor. If a certified or cashier's check is provided, the successful bidder shall deliver, at the bid opening address, the original certified or cashier's check within twenty-four (24) hours of receipt of the bid opening The Owner reserves the right to reject any or all Bids and to waive all defects and irregularities in bidding or bidding process except time of submitting a Bid.

Details

Division 11 - Equipment, Operation and Maintenance of Equipment, Vehicle Service Equipment, Maintenance Equipment, Unit Kitchens, Residential Equipment, Residential Appliances, Agricultural Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents