Similar Projects
Habitat for Humanity Homes
New Construction, Infrastructure
Conception
$5,000,000 CJ est. value
Macon, GA 31201

SR211 at Cedar Creek Road Intersection Improvement - County of Barrow
Infrastructure
Conception
$2,500,000 CJ est. value
Winder, GA 30680

Patrick Mill Rd / Harbins Rd at Apalachee River 3.6 Mi S of Carl
Demolition, New Construction, Infrastructure
Design
$1,000,000 CJ est. value
Winder, GA 30680

SR 29 BU/US 441bu at Fishing Creek in Milledgeville
Demolition, New Construction, Infrastructure
Design
$8,000,000 CJ est. value
Milledgeville, GA 31061

The Buildout of the Multi-Use Assembly Space at Tubman Museum
New Construction, Infrastructure - 6,323 SF
Bidding
$450,000 CJ est. value
Macon, GA 31201

Signing Upgrades at Various Locations
Infrastructure
Bidding
$8,733,518 CJ est. value
Savannah, GA 31406

Max Fitness / Macon
New Construction, Infrastructure - 40,703 SF
Post-Bid
$12,000,000 CJ est. value
Macon, GA 31210

New Pool Bleachers
Renovation
Post-Bid
$400,000 est. value
Adairsville, GA 30103

NPHC Park Construction
New Construction
Results
Statesboro, GA 30458

Renovation of Gateway Park
Renovation
Results
Macon, GA 31201

Residential Window and Door Manufacturing Facilities
New Construction, Infrastructure
Construction
$125,000,000 CJ est. value
Macon, GA 31201

Hyundai Motors Electric Vehicle And Battery Manufacturing Plant
New Construction, Infrastructure
Pending Verification
$5,500,000,000 CJ est. value
Ellabell, GA 31308

Forsyth Street Convenience Store and Gas Station
New Construction, Infrastructure
Pending Verification
$1,500,000 CJ est. value
Macon, GA 31201

Rocky Creek Sewer Lines and the Riverside Basin Sewer Project - Macon Water Authorit
Infrastructure
Conception
$28,000,000 CJ est. value
Macon, GA 31201

Amazon Sortation Facility - Project Oak / Atlanta
New Construction, Infrastructure - 3,200,000 SF
Design
$300,000,000 CJ est. value
Emerson, GA 30137

Last Updated 12/07/2022 11:26 AM
Project Title

Main Street Park Improvements

Physical Address View project details and contacts
City, State (County) Dawsonville, GA 30534   (Dawson County)
Category(s) Heavy and Highway
Sub-Category(s) Park/Playground, Site Development
Contracting Method Competitive Bids
Project Status Sub-Bidding Closed, Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $30,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

A. The Bid lists each item of the Project for which payment will be made. No payment will be made for any items other than those listed in the Bid. B. Required items of work and incidentals necessary for the satisfactory completion of the work which are not specifically listed in the Bid, and which are not specified in this Section to be measured or to be included in one of the items listed in the Bid, shall be considered as incidental to the work. All costs thereof, including Contractor's overhead costs and profit, shall be considered as included in the lump sum or unit prices bid for the various Bid items. The Contractor shall prepare the Bid accordingly. C. Work includes furnishing all labor, equipment, tools and materials, which are not furnished by the Owner and performing all operations required to complete the work satisfactorily, in place, as specified and as indicated on the Drawings. D. Contractor is not entitled to overhead, profit and mark-up on allowance monies not spent. If the cost, when determined, is more or less This project shall include the construction of the Main Street Park Improvements, including grading and site work for four pickleball courts and a basketball court, and the furnishing of all materials, labor, equipment, and appurtenances necessary to complete the work described within the plans and specifications. The project duration for construction is 30 consecutive calendar days for substantial completion and 60 days for final completion. Any questions should be directed to Betsy Dexter in writing to betsy@cecincga.com. The last day for submission of questions shall be Tuesday, November 29, 2022.

Details

Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 31 - Earthwork, Selective Clearing, Grading.
Division 32 - Exterior Improvements, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents