Similar Projects
Quincy Street Improvements
Infrastructure
Bidding
Pittsburg, KS 66762

Milling, Patch, Overlay, and Concrete Maintenance Program (Phase 1)
Infrastructure
Bidding
$5,000,000 est. value
Lawrence, KS 66044

Joint and Crack Sealant
Infrastructure
Post-Bid
Wichita, KS

Linear Grading, Reinforced Concrete Pipe, Subgrade Modification
Infrastructure, Alteration
Post-Bid
Eudora, KS 66025

Whispering Meadows Unit Seven, Sewer, Water, And Street Improvements
Results
KS

Farmland Road Improvements
Infrastructure
Results
Garden City, KS

2022 Street Sealing Project
Infrastructure
Bidding
Garden City, KS

2021 Crack Seal Program
Infrastructure
Post-Bid
Lawrence, KS

2021 Crack Seal
Infrastructure
Results
Shawnee, KS

Grading and Surfacing
Infrastructure
Bidding
$3,000,000 est. value
Leoti, KS 67861

Grading, Bridge and Surfacing
New Construction, Infrastructure
Post-Bid
KS

2021 Outsourced Pavement Preservation Program CIP Arterial Concrete Street Repairs Phase 3
Infrastructure, Alteration
Results
Wichita, KS

Grading, Bridge, and Surfacing
Renovation, Infrastructure
Bidding
$400,000 est. value
De Soto, KS 66018

Chip Seal
Infrastructure
Post-Bid
KS

Street Improvement
Infrastructure
Results
Topeka, KS 66630

Last Updated 04/26/2022 04:39 PM
Project Title

Arterial Street Maintenance

Physical Address View project details and contacts
City, State (County) Hutchinson, KS   (Reno County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $730,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The proposed Work provides for the furnishing of all materials, equipment and labor for constructing the Arterial Street Maintenance project in the City of Hutchinson, Kansas, and consists of the following estimated quantities for sample units of work: 2” Asphalt Milling – 28,666 SY 0”-1.5” Asphalt Edge Milling (6.5’ Wide) – 3,067 SY SR12.5A Asphalt Overlay – 3,616 TONS Overexcavation with AB-3 – 30 CY Other Work includes: striping, base repair, traffic control, and public relations.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents