Similar Projects
Fullerton Transportation Center ADA Improvements - 55053
Infrastructure
Conception
$1,000,000 est. value
Fullerton, CA 92832

Fullerton Transportation Center ADA Improvements - 55053
Infrastructure
Conception
$1,000,000 est. value
Fullerton, CA 92832

Center Greens - City of Anaheim
Infrastructure
Design
$3,520,000 CJ est. value
Anaheim, CA 92805

Center Greens - City of Anaheim
Infrastructure
Design
$3,520,000 CJ est. value
Anaheim, CA 92805

Culver Drive Pavement Rehabilitation
Infrastructure
Post-Bid
$1,240,000 est. value
Irvine, CA 92604

FY 2021-22 Annual Pavement Preservation Project (Zone 6)
Infrastructure
Post-Bid
$6,220,000 CJ est. value
Yorba Linda, CA 92886

First Street Slope Stabilization Project (Rebid2)
Infrastructure
Results
$4,482,892 CJ est. value
Santa Ana, CA 92701

First Street Slope Stabilization Project (Rebid2)
Infrastructure
Results
$4,482,892 CJ est. value
Santa Ana, CA 92701

AutoZone #3001 / Anaheim
New Construction, Infrastructure - 7,000 SF
Construction
$1,500,000 CJ est. value
Anaheim, CA 92801

AutoZone #3001 / Anaheim
New Construction, Infrastructure - 7,000 SF
Construction
$1,500,000 CJ est. value
Anaheim, CA 92801

South Aircraft Parking Ramp Pavement Rehabilitation - City of Fullerton
Alteration
Conception
Less than $2,200,000 est. value
Fullerton, CA 92833

Grace Church Of Orange Sports Building
New Construction, Infrastructure - 8,662 SF
Design
$2,000,000 CJ est. value
Orange, CA 92869

Visitors Center Plaza Renovation and Site Utility Infrastructure Upgrades
Infrastructure, Renovation
Post-Bid
$5,723,000 CJ est. value
Irvine, CA 92618

EWWTP Well 3 Drilling
Infrastructure
Results
$587,085 CJ est. value
Elmira, CA 95625

San Juan Hills High School Turf Replacement Project
Infrastructure
Construction
$668,535 CJ est. value
San Juan Capistrano, CA 92675

Last Updated 12/19/2023 02:04 PM
Project Title

Marina Hills Park Improvements

Physical Address View project details and contacts
City, State (County) Laguna Niguel, CA 92677   (Orange County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Park/Playground, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Results, Construction start expected February 2024
Bids Due View project details and contacts
Estimated Value $603,012 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The work to be performed or executed under these specifications consists of furnishing all materials, equipment, tools, labor and incidentals as required by the contract documents to construct the above stated project. The general items of work to be done hereunder consists of demolition; grading; constructing a post-tension PCC basketball court, hardscaping, irrigation, landscaping, drainage, and park amenities. Liquidated Damages $500/CALENDAR DAY Start/Delivery Date February 2024 Project Duration 80 WORKING DAYS The City reserves the right to reject any Bid or all Bids, and to waive any irregularities or informalities in any Bid or in the bidding, as deemed to be in its best interest.

Details

Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 31 - Earthwork, Selective Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents