Similar Projects
Maintenance Job Order Contracting (Joc) Infrastructure Repairs, South - 2021
Bidding
$5,000,001 to $10,000,000 est. value

Maintenance Job Order Contracting (JOC) Basin Restoration Contract, Statewide - 2019
Infrastructure
Bidding
$5,000,000 est. value

2019 State Aid Improvement of River Road
Post-Bid
Galloway, NJ

2019 New York Avenue Road Reconstruction
Post-Bid
Mays Landing, NJ 08330

2018 Folsom Borough Road Program
Results
Folsom, NJ

Reconstruction of River Drive
Results
$137,900 est. value
NJ

Construction Management and Inspections Caspian Pointe Pedestrian and Bicycle Connection
Post-Bid
Atlantic City, NJ

2019 Road Program Phase I
Results
$384,000 est. value
Somers Point, NJ 08244

Asphalt Repaving
Post-Bid
Egg Harbor Township, NJ 08234

FY 2019 NJDOT Municipal Aid Program, Reconstruction of South Boulevard
Results
$248,900 est. value
Minotola, NJ 08341

Pitney Road Pedestrian Safety Improvements
Post-Bid
Absecon, NJ 08201

Mid Atlantic Construction IDIQ (MATOC)
Results
$50,000 to $2,000,000 est. value

City Hall ADA Compliance and Parking Area Repaving and City Library Parking Area Repaving
Post-Bid
Northfield, NJ 08225

Fairmount Avenue Improvement
Results
$296,643 est. value
Atlantic City, NJ 08401

Asphalt Paving
Post-Bid

Last Updated 05/17/2021 08:54 AM
Project Title

Resurfacing of Wabash Avenue Phase II

Physical Address View project details and contacts
City, State (County) Linwood, NJ 08227   (Atlantic County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $285,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Includes the furnishing of all labor, materials and equipment necessary to complete the work shown on the Drawings and as described in the Specifications. The work consists of the milling and resurfacing of approxi-mately 6,846 square yards of roadway, concrete improvements, the installation of 10 stormwater inlets and approximately 675 linear feet of stormwater pipe, the construction of 2 stormwater sediment trap structures, the excavation of 390 cubic yards of earth and the installation of 35 cubic yards of K-5 sand for a stormwater basin, installation of regulatory and warning signs, the application of traffic markings and striping, and the associated restoration work in the City of Linwood. The work is located within the City of Linwood on Wabash Avenue from Devonshire Avenue to Patcong Avenue and on Hamilton Avenue.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents