Similar Projects
Backwater Valve Contract - Phase 5
Infrastructure
Bidding
Bridgeville, PA

Manhole Inserts
Infrastructure
Bidding
Carnegie, PA

Penn Hills 2019 CCTV Inspection Contracts - Contract B
Post-Bid
Pittsburgh, PA 15123

Jacks Run Road Sewer Repair
Post-Bid
Pittsburgh, PA 15237

North Road Sanitary Sewer Extension
Results
Less than $954,060 est. value
Oakdale, PA 15071

Center Avenue Sanitary Sewer Repair
Results
Pittsburgh, PA 15202

Mary Ellen Sanitary Sewer
Infrastructure
Bidding
$80,000 est. value
North Versailles, PA 15137

Sanitary Sewer Certification (Dye) Testing Services
Post-Bid
Glenshaw, PA 15116

SHACOG Joint Municipal Sewer Excavation Repairs - Year 9
Results
Emsworth, Heidelberg, Ingram, Jefferson Hills, Mount Oliver, PA

Regional Trunk Sewer Takeover
Infrastructure
Bidding
$250,000 est. value
Rankin, PA

2021 Sanitary Sewer Repair Projects - Grow Grant Lining Contract
Post-Bid
Pittsburgh, PA

SHACOG Joint Municipal Sewer CIPP Lining Repairs - Year 14
Results
Emsworth, Heidelberg, Ingram, Jefferson Hills, Mount Oliver, PA

2021 Sanitary Sewer Repair Projects - Excavation Contract
Post-Bid
Pittsburgh, PA

Sewer and Catch Basin Maintenance Authority Wide
Results
Pittsburgh, PA 15219

2021 CCTV Inspections
Post-Bid
Pittsburgh, PA

Reported 03/04/2022 12:00 AM
Project Title

2022 Open Cut Spot Repair Project

Physical Address View project details and contacts
City, State (County) Dormont, PA   (Allegheny County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

This project involves 9 specific sanitary sewer point repairs including, but not limited to: sanitary sewer excavation, point repair and replacement, including wye and lateral repairs, MH installation, MH location and raising, bench and invert installation, installation of an underdrain system, any bypass pumping, Contractor CCTV verification of the repair locations, post repair CCTV, complete restoration in asphalt street, brick street, concrete street, concrete sidewalk and/or landscape areas as needed. Project also includes all traffic control as needed.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents