Similar Projects
Venture Academy High School Improvements
Renovation
Conception
Minneapolis, MN 55414

Venture Academy Middle School
Build-Out
Conception
Minneapolis, MN

New Athletic Complex - Crookston School District
New Construction
Design
$3,900,000 est. value
Crookston, MN

Installation of Audio Enhancement and Replacement of Video Cabling
Renovation
Design
$300,000 est. value
Saint Francis, MN

Highland Park Middle School ARP HVAC Upgrades
Renovation
Sub-Bidding
$500,000 CJ est. value
Saint Paul, MN 55116

Becker Public Schools Middle School/High School Additions and Remodeling
Addition, Demolition, Build-out, Infrastructure
Sub-Bidding
$6,300,000 CJ est. value
Becker, MN 55308

White Bear Lake Area High School North Campus Addition & Renovation
Post-Bid
Saint Paul, MN 55110

East Grand Forks Public Schools 2021 Improvements
Renovation
Post-Bid
East Grand Forks, MN

Moorhead Public High School
Renovation
Results
$100,000,000 est. value
Moorhead, MN 56560

MPS Northeast Middle School Entrance and Remodel
Renovation - 1,225 SF
Results
$2,045,000 to $2,445,000 est. value
Minneapolis, MN 55418

Central Education Center
Renovation
Construction
Richfield, MN 55423

Baker OLC Shower/Infirmary Building
Construction
$900,000 to $950,000 est. value
Maple Plain, MN 55359

Kitchen Updates at Intermediate and Middle School - 2021 Referendum - Byron Public Schools
Renovation
Pending Verification
$846,000 est. value
Byron, MN 55920

Rice Creek Commons
New Construction - 2,250,400 SF
Conception
$750,000,000 est. value
Arden Hills, MN 55112

Willmar Middle School Addition - Willmar School Board
Addition
Design
$16,000,000 est. value
Willmar, MN 56201

Last Updated 07/29/2022 01:12 PM
Project Title

Lake Park Audubon Secondary School CTE Addition & Renovations

Physical Address View project details and contacts
City, State (County) Lake Park, MN 56554   (Becker County)
Category(s) Education
Sub-Category(s) Middle/Senior High School
Contracting Method Competitive Bids
Project Status Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $950,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of one prime work scope for all the Lake Park Secondary School CTE Addition and other renovations work necessary to: add a CTE addition, renovate the library, and renovate the (2) collaborative work spaces within the existing school in Lake Park [COMPLETE]. This Bid package, Bid Package 1, consists of Work Scopes 1 and NO others.

Details

Division 03 - Concrete, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances and Storefronts, Windows, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents