Similar Projects
Olive Crossing Mixed Use Development
New Construction - 253,133 SF
Conception
$10,000,000 CJ est. value
Olivette, MO 63132

Bingman Office/Warehouse
New Construction - 10,000 SF
Conception
$1,000,000 to $5,000,000 CJ est. value
Wentzville, MO 63385

Cornerstone Subdivision Lot C
New Construction, Addition - 6,560 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Saint Peters, MO

Cargo Largo Retail Stores
New Construction - 531,000 SF
Design
$5,000,000 to $10,000,000 CJ est. value
Independence, MO

RFQ Construction Manager at Risk Services - Capital Improvements and Construction Work on District Facilities
Renovation
Bidding
$55,000,000 CJ est. value
Columbia, MO 65203

South County Technical High Schools Additions and Alterations
Renovation
Post-Bid
$6,000,000 to $8,000,000 est. value
Saint Louis, MO 63127

South County Technical High Schools Additions and Alterations
Renovation
Post-Bid
$6,000,000 to $8,000,000 est. value
Saint Louis, MO 63127

Red Cedar Inn Rehabilitation & Reuse
Renovation, Addition - 2,286 SF
Results
Pacific, MO 63069

Bus Stop Improvements - Multiple Locations
New Construction
Results
Kansas City, MO

Netrality 14Th Floor Fit-Out
Build-Out - 22,000 SF
Construction
Saint Louis, MO 63101

Netrality 14Th Floor Fit-Out
Build-Out - 22,000 SF
Construction
Saint Louis, MO 63101

Veterans Housing Development
New Construction - 25,822 SF
Pending Verification
$1,000,000 to $5,000,000 CJ est. value
Saint Louis, MO

Rb Manufacturing Expansion
Addition - 190,425 SF
Pending Verification
Saint Peters, MO

Cambridge Crest
New Construction, Infrastructure
Conception
$100,000,000 CJ est. value
Kansas City, MO 64106

Corporate Parkway Business Park
New Construction - 75,000 SF
Design
$5,000,000 to $10,000,000 CJ est. value
Wentzville, MO 63385

Last Updated 11/07/2022 04:06 PM
Project Title

New Transportation Garage and Office Building - 2021 Bond Proposition S - Mehlville School District

Physical Address View project details and contacts
City, State (County) Saint Louis, MO 63103   (Saint Louis City County)
Category(s) Commercial, Transportation
Sub-Category(s) Misc. Structures, Office
Contracting Method Competitive Bids
Project Status Design Development, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $3,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

https://callnewspapers.com/facilities-projects-underway-in-mehlville/ - Several facilities projects in the Mehlville School District were completed this summer, with others scheduled to be completed throughout the school year and into next summer. Projects included kitchen ceiling replacement, roof replacements, HVAC, asphalt repair and tuckpointing at multiple different buildings, Facilities Director Mike Gegg said during a project update at the Aug. 18 Board of Education meeting. Funding for the projects came from different sources, including the $35-million bond Proposition S, federal Elementary and Secondary School Emergency Relief money and the district's capital fund. Roof replacements at Beasley Elementary and John Cary Early Childhood were completed this summer. They were originally slated to be completed in fiscal year 2022, but labor shortages postponed the project to later on this summer. The roof replacement at Bierbaum Elementary was completed in March; Point Elementary's replacement has started but supply delays have postponed that project's completion until summer 2023. Gegg said the back portion of Point is complete however. The replacement at Trautwein is "about 60 percent" finished, said Gegg, with the rest scheduled to be finished during the school year. "That's just a cover-up, so it's not as noisy as a tear-off," Gegg said. The replacement at Wohlwend will start in summer 2023 due to supply shortages. Washington Middle is being staged and will be completed during the school year. The replacement at Mehlville High School will most likely begin next summer. HVAC replacement projects, funded by ESSER, "went smooth" at Beasley, Point and Oakville Elementary, while the HVAC replacement at Rogers Elementary is about 98-percent complete. That project is funded by Prop S and should be completed in the next few weeks. Asphalt sealing and striping was done at several locations, along with concrete work on the driveways at Beasley and John Cary. Beasley also got a new kitchen ceiling and new paint to "brighten up the kitchen." Tuckpointing work at the district's pool will be completed within the next month, while tuckpoint projects at Point and Wohlwend will be completed in summer 2023. "Last year it was labor, this year it's the supply chain," Gegg said of the delays. "(Hopefully) the supply chain will be better next year." ________________________________________________________________________________________________________ New Transportation Garage and Office Building Build a 15,000-square-foot transportation garage and office building This project is part of the $35 million Proposition S Bond which was passed and approved by the voters on April 6, 2021. As of April 4, 2022, Information regarding a construction manager/general contractor is not available. Design work has started. Bids are scheduled to open in February of 2023. A timeline for construction has not been determined, however, the anticipated completion date is October of 2024.

Details

Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances and Storefronts, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Carpeting, Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Protective Covers, Transportation Stop Shelters.
Division 12 - Furnishings, Window Treatments, Casework, Rugs and Mats, Office Furniture, Multiple Seating, Pews and Benches, Benches.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Base Courses, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Sidewalks, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents