Similar Projects
Chemical Feed System at the Wastewater Treatment Facility
Renovation
Bidding
Angelica, WI

WWTF Valve Upgrades
Renovation
Bidding
Lake Nebagamon, WI

Rest Area 106 Wastewater Upgrade
Post-Bid
Dickeyville, WI 53808

Wastewater Treatment Facility Expansion
New Construction
Post-Bid
Kaukauna, WI 54130

Aeration System Upgrades
Results
South Wayne, WI 53587

Cornell WWTP Facility Improvements
Results
Cornell, WI 54732

Osmosis Plant at the Calumet County Park
New Construction
Bidding
Hilbert, WI 54129

2020 Waste Water Treatment Facility Sludge Dewatering System Improvements
Post-Bid
Less than $500,000 est. value
Portage, WI 53901

2020 WWTF Upgrade
Results
Less than $5,400,000 est. value
Palmyra, WI 53156

Water Treatment Services
Term Contract
Post-Bid
Black River Falls, WI 54615

Wastewater Treatment Facility Phase I Improvements
Results
Egg Harbor, WI 54209

Digester Cover Rehabilitation Project
Renovation
Post-Bid
Less than $300,000 est. value
Waupaca, WI

Barneveld WWTF Upgrades
Results
Barneveld, WI

Operations Building Elevator Modernization
Renovation
Post-Bid
$100,000 est. value
Madison, WI 53713

WWTF Chemical Phosphorus Removal Upgrade
Results
Brownsville, WI 53006

Last Updated 09/17/2021 02:30 PM
Project Title

Jones Island Water Reclamation Facility Primary Clarifiers Drive Improvements

Physical Address View project details and contacts
City, State (County) Milwaukee, WI 53207   (Milwaukee County)
Category(s) Sewer and Water
Sub-Category(s) Sewage Treatment Plant
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project contemplated consists of improvements to eight (8) primary clarifiers. The work includes, but is not limited to: 1. Replace and/or rehabilitate the existing clarifier drives. 2. Raise the elevation of the clarifier drives, walkway bridges and associated improvements to concrete stairs. 3. Replace automatic condensate drains and heat tracing. 4. Replace and increase the size of the clarifier drive platforms. 5. Provide and install continuous torque monitoring systems

Details

Sewage Treatment Plant, Renovation.
Division 46 - Water and Wastewater Equipment, Clarifier Equipment, Traveling Bridge Clarifier Equipment, Circular Clarifier Equipment, Flocculating Clarifier, Pulsating Sludge Blanket Type, Ballasted High-rate Clarifier Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents