Similar Projects
HMA Resurfacing
Infrastructure
Post-Bid
IA

PCC Patching
Infrastructure
Results

Slurry Seal - IOWA 173
Infrastructure
Bidding
IA

Granular Surfacing of Roadway
Infrastructure
Bidding

PCC Patching
Infrastructure
Results
IA

Wilson Island SRA Pavement Repair
Infrastructure
Results
IA

HMA Resurfacing with Milling
Infrastructure
Results
IA

HMA Resurfacing
Infrastructure
Post-Bid
IA

Hma Resurfacing
Infrastructure
Results
IA

Reconstruction - Bridge Deck Replacement
New Construction, Infrastructure
Results
IA

PCC Pavement - Replace
Infrastructure
Results
IA

PCC Patching
Infrastructure
Results

Remington Avenue Improvements
Infrastructure
Results
$168,365 est. value
Neola, IA 51559

HMA Resurfacing with Milling - M47
Infrastructure
Bidding
IA

Granular Surfacing of Roadway
Infrastructure
Bidding

Last Updated 02/16/2022 05:47 AM
Project Title

HMA Resurfacing

Physical Address View project details and contacts
City, State (County) (Cass, Pottawattamie Counties)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

0.7 Mi w Of Us 71 To Adair Co (Eb) 1,956.05 Ton Asphalt Binder 1,444.40 Gallon Asphalt Emulsion, Fog Seal 1.00 Lump Sum Construction Survey 299.04 Ton Granular Shoulders, Type b 28,269.22 Ton Hot Mix Asphalt 68,557.50 Linear Foot Joints, Repair Longitudinal 378.00 Each Patches By Count 508.30 Square Yard Patches, Full-Depth 6,356.00 Square Foot Patches, Partial-Depth p.c.c. 1,772.84 Station Pavement Markings Imx-080-1(507)40--02-78 Route: i-80 w Nishnabotna River To 1 Mi e Of The Weigh Station (Wb) 787.18 Ton Asphalt Binder 584.80 Gallon Asphalt Emulsion, Fog Seal 0.10 Miles Cracks & Joints (Repair) Pcc 209.77 Ton Granular Shoulders, Type b 10,358.54 Ton Hot Mix Asphalt 2.00 Each Patches By Count 27.80 Square Yard Patches, Full-Depth 1,140.59 Station Pavement Markings 123,615.90 Square Yard Pavement Scarification Imx-080-1(508)50--02-15 Route: i-80 Pottawattamie Co To e Of The Ia 173 Interchange (Wb) 927.44 Ton Asphalt Binder 649.40 Gallon Asphalt Emulsion, Fog Seal 187.06 Ton Granular Shoulders, Type b 11,593.03 Ton Hot Mix Asphalt 449.90 Station Pavement Markings 138,419.20 Square Yard Pavement Scarification Imx-080-1(522)28--02-78 Route: i-80 0.4 Mi e Of i-880 To 0.1 Mi w Of Silver Creek Bridge (Eb/Wb) 1,178.21 Ton Asphalt Binder 1,482.20 Gallon Asphalt Emulsion, Fog Seal 600.00 Ton Granular Shoulders, Type b 19,636.78 Ton Hot Mix Asphalt 19.00 Each Patches By Count 496.70 Square Yard Patches, Full-Depth 1,654.14 Station Pavement Markings 114,646.40 Square Yard Pavement Scarification Imx-080-1(524)35--02-78 Route: i-80 0.1 Mi w Of Silver Creek Bridge To Cass Co (Eb/Wb) 1,838.34 Ton Asphalt Binder 2,514.10 Gallon Asphalt Emulsion, Fog Sea 1,000.00 Ton Granular Shoulders, Type b 30,638.92 Ton Hot Mix Asphalt 31.00 Each Patches By Count 410.90 Square Yard Patches, Full-Depth 2,800.86 Station Pavement Markings 178,880.80 Square Yard Pavement Scarification

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents