Similar Projects
SR 524/Olympic Ave Vic To 48th Ave W Vic - ADA Compliance
Infrastructure
Design
$2,296,000 est. value
WA

SR 99/Lincoln Way Vic to Evergreen Way - ADA Compliance
Infrastructure
Design
$969,000 CJ est. value
Everett, WA 98208

Parking Lot / Sidewalk Repairs
Infrastructure
Bidding
$300,000 est. value
Marysville, Monroe, Mukilteo, WA

Ductile Iron Pipe
Alteration
Post-Bid
Everett, WA

8th Street Improvements Project
Alteration
Post-Bid
$739,767 est. value
Marysville, WA

Nugget Park Sidewalk Replacement
Infrastructure
Results
$275,000 to $350,000 est. value
Brier, WA 98036

Fisherman's Harbor Commercial Development Parcels A8 & A17
New Construction, Infrastructure, Alteration - 6,000 SF
Results
$4,300,000 to $4,700,000 est. value
Everett, WA 98213

Biosolids Beneficial Use Services
Term Contract
Post-Bid

Engineering Services for North Sound to Olympics (STO) Trail Planning Study
Infrastructure
Results
Less than $343,000 est. value

Rodent and Pest Control
Term Contract
Post-Bid
Arlington, Everett, Granite Falls, Mountlake Terrace, Snohomish, Sultan, WA 98204

164th Street SW Transmission Main Connection
Infrastructure
Results
$10,000,000 to $12,000,000 est. value
WA

Janitorial Services
Term Contract
Post-Bid
Arlington, WA 98223

SR 525, Mukilteo Pedestrian and Traffic Improvements MP 8.32 to MP 8.43
Infrastructure
Results
WA

HASCO Properties - Asphalt Sealcoat, Stripe, and Miscellaneous Repairs
Infrastructure
Post-Bid
$3,000,000 est. value
Everett, Lake Stevens, Lynnwood, Marysville, Mountlake Terrace, Snohomish, WA 98043

2021 Complete Streets Pedestrian Improvements Project
Infrastructure
Results
$130,000 to $150,000 est. value
Mill Creek, WA

Last Updated 07/22/2022 04:39 PM
Project Title

Operations Center Transformer Access Walkway

Physical Address View project details and contacts
City, State (County) Everett, WA 98201   (Snohomish County)
Category(s) Heavy and Highway, Single Trades
Sub-Category(s) Service/Term Contracts, Sidewalks/Parking Lot
Contracting Method Competitive Bids
Project Status Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $75,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The Contract work consists of providing all materials, labor, tools, equipment, temporary facilities and construction expertise required to construct a walkway and platform to provide access to transformers and switches located on a hill on the west side of the District's Operations Center. The walkway will require approximately 100 feet of thickened-edge concrete sidewalk, along with 25 feet of normal sidewalk, and a 400 square foot concrete pavement access platform. A removeable safety railing is also included in the scope of work. Location of work is 1802 75th Street SW, Everett WA, Snohomish County. Contractors shall be on the District's Small Works Roster and currently Prequalified for Category: "Concrete Construction" or "General Construction" prior to bidding. All requests for clarification or additional information regarding this RFP must be submitted to the District via e-mail to bids@snopud.com. The District will not guarantee responses to questions received via other forms of communication (phone, voicemail, text, IM, etc.). Do not submit questions via Public Purchase.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents