Similar Projects
Glenwood St, Goddard Rd / US 20/26 (Chinden Blvd) - Ada County Highway District
Infrastructure
Conception
$762,000 est. value
Boise, ID

Maple Grove Road and Edna Street Pedestrian Crossing - Ada County Highway District
Infrastructure
Conception
$245,000 est. value
Boise, ID 83704

RFQ D/B - Student Residence Hall
New Construction, Infrastructure
Design
$4,181,379 CJ est. value
Boise, ID 83706

Lewiston Regional Office Facility Improvements - Phase II
New Construction, Infrastructure, Renovation
Design
$1,000,000 CJ est. value
Boise, ID 83702

Spring Valley Water Storage Reservoirs No.1 and No.2
New Construction, Infrastructure
Bidding
$2,000,000 CJ est. value
Meridian, ID 83642

Spring Valley Water Storage Reservoirs No.1 and No.2
New Construction, Infrastructure
Bidding
$2,000,000 CJ est. value
Meridian, ID 83642

FY23 D3 Interstate Striping
Infrastructure
Sub-Bidding
$500,000 CJ est. value
Boise, ID 83716

FY23 D3 Interstate Striping
Infrastructure
Sub-Bidding
$500,000 CJ est. value
Boise, ID 83716

Dust Abatement Dirt Roads
Term Contract
Post-Bid
Dixie, Elk City, Meridian, ID 83525

Prime Earth Pit Reclamation
Infrastructure
Post-Bid
Eagle, ID 83616

SH-64, NezPerce to Drake Road
Infrastructure
Results
$100,000 to $500,000 est. value

Widening SH-21 Between MP 0.787 and 3.023
Infrastructure
Results
$2,500,000 to $5,000,000 est. value
ID

Lavender Heights Residential Development / Meridian
New Construction, Infrastructure
Pending Verification
$92,000,000 CJ est. value
Meridian, ID 83642

Southridge South Residentail Development
New Construction, Infrastructure
Pending Verification
$5,000,000 CJ est. value
Meridian, ID 83642

RFP Design - Design Plans for Pickles Butte Sanitary Landfill Gas Collection Project
Alteration
Conception
Boise, ID

Last Updated 08/05/2022 12:33 PM
Project Title

Driving Track Phase 2 - Meridian Complex, Idaho State Police

Physical Address View project details and contacts
City, State (County) Meridian, ID 83642   (Ada County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $485,167 [brand] Estimate
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

A description of the work of this project can be summarized to include removal of existing asphalt surfacing full depth, compacting base course, installation of new 3" Superpave asphalt surfacing, striping lane lines and centerline stripe. A bid bond in the amount of 5% of the total bid amount, including any add alternates, is required. A Public Works Contractor's License for the State of Idaho is required to bid on this work.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents