Similar Projects
Amber Ridge
New Construction - 20,000 SF
Conception
Bowie, MD 20715

Granite Cliffs - Master Plan
Conception
Port Deposit, MD 21245

Waldorf Station
New Construction - 276,200 SF
Design
Waldorf, MD 20603

Heritage Green
New Construction
Design
La Plata, MD

Mace Medical Offices
New Construction - 14,400 SF
Post-Bid
$1,000,000 to $5,000,000 CJ est. value
Dundalk, MD 21222

Glenarden Hills Town House Lots Development: Homebuilders Letter Of Intent
New Construction - 6,000 SF
Post-Bid
Glenarden, MD 20706

210 On The Park Townhomes
New Construction
Results
$45,000,000 est. value
Capitol Heights, MD 20743

General Contractor Request for Qualifications for the Renovation of three (3) distinct Multifamily Properties in Montgomery County, Maryland Contractor Evaluation and Selection Process: Phase 1
Results
Derwood, Gaithersburg, Silver Spring, MD

Ballard Green
New Construction
Construction
$5,000,000 to $10,000,000 CJ est. value
Owings Mills, MD 21117

Lexington Park Ford
New Construction - 30,000 SF
Construction
$6,500,000 est. value
California, MD 20639

Patapsco Fields Townhouses
New Construction
Pending Verification
Windsor Mill, MD 21244

Henderson Crossing
New Construction
Pending Verification
$15,000,000 est. value
Baltimore, MD

Maple Grove
New Construction
Conception
Ellicott City, MD

South Lake - Masterplan
New Construction - 560,272 SF
Design
Bowie, MD 20774

Eager Square Apartments
New Construction - 288,681 SF
Post-Bid
$10,000,000 CJ est. value
Baltimore, MD 21202

Reported 01/10/2020 03:20 PM
Project Title

Kellerton Knolls Land Bay A

Physical Address View project details and contacts
City, State (County) Frederick, MD 21701   (Frederick County)
Category(s) Heavy and Highway, Residential
Sub-Category(s) Multi-Family Homes, Single-Family Homes, Site Development
Contracting Method
Project Status Permitting, Construction Start Expected February 2020
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Single Family Home construction underway. Model Homes are complete. Townhome Construction expected to begin January 2020.

Details

Multi-Family Homes, New Construction, Site Development, New Construction, 127 Lots, Single-Family Homes, New Construction.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents