Similar Projects
2022-1 CCMG Community Crossings Paving Program
Infrastructure
Bidding
$390,000 est. value
Hymera, IN

2022-1 CCMG Community Crossing Paving Program
Infrastructure
Bidding
$390,000 est. value
Shelburn, IN

2020-2 Community Crossings Matching Grant (CCMG)
Post-Bid
Merom, IN

2020-2 CCMG Paving
Post-Bid
Farmersburg, IN

Bike and Pedestrian Facilities
Results
IN

High Friction Surface Treatment
Results

Community Crossings Asphalt Overlay
Infrastructure
Post-Bid
Sullivan, IN

2021-1 Community Crossings Paving Program
Infrastructure
Results
Carlisle, IN

2021-1 Community Crossings Paving Program
Infrastructure
Post-Bid
Shelburn, IN

Mill Street Parking and Sidewalk Improvements
Infrastructure
Results
$218,261 est. value
Shelburn, IN

Community Crossings Asphalt Overlay on Various County Roads
Infrastructure
Post-Bid
$293,000 est. value
Sullivan, IN 47882

I-70 Design-Build Added Travel Lanes and Pavement Replacement from SR-1 to IN/OH State Line
Infrastructure
Results

2022 CCMG Community Crossings Paving Program
Infrastructure
Post-Bid
$500,000 est. value
Farmersburg, IN

Bike and Pedestrian Facilities
Infrastructure
Results
IN

2022-1 Community Crossings Matching Grant (CCMG) Project
Infrastructure
Post-Bid
$1,000,000 est. value
Dugger, IN

Reported 06/15/2022 12:00 AM
Project Title

2022-1 Community Crossings Matching Grant (CCMG) Project

Physical Address View project details and contacts
City, State (County) Merom, IN 47861   (Sullivan County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected July 2022
Bids Due View project details and contacts
Estimated Value $400,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The scope of the project includes 4212 sys of HMA milling, 348 tons of HMA paving, 633 sys of concrete sidewalk removal, 880 sys of concrete sidewalk construction, and construction of 6 curb ramps along Fifth Street.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents