Similar Projects
Boiler Plant Upgrades
Renovation, Alteration
Design
$100,000 to $250,000 est. value
Bath, NY 14810

Binghamton University Welcome Center - Mechanical
Alteration
Bidding
$200,000 est. value
Binghamton, NY 13902

Domestic Hot Water Heaters
Alteration
Bidding
Rochester, NY

Preventive Maintenance of Building Management System (BMS) and Ancillary Equipment
Term Contract
Post-Bid
Syracuse, NY 13210

Water Treatment Chemicals
Post-Bid
Newburgh, NY

Lansing CSD - Reconstruction to Senior High School - Mechanical
Results
Less than $80,000 est. value
Lansing, NY 14882

Building 17 Power Plant Equipment Maintenance, Testing and Repair for Centrifugal Chillers at West Averill Harriman State Office Campus
Term Contract
Results
Albany, NY 12226

Steam System Improvement
Alteration
Bidding
$460,000 est. value
Orangeburg, NY 10962

2017 Capital Improvement Project Phase 2B - Mechanical
Post-Bid
Fallsburg, NY 12733

Centrifuge Maintenance and Repair Services
Term Contract
Results
Orangeburg, NY 10962

Addition and Reconstruction at PS18 - Mechanical Construction MC-18
Alteration
Bidding
$100,000 est. value
Troy, NY 12180

2019-2020 Capital Outlay Project - Contract 101: Mechanical Trades
Post-Bid
Adams, NY

NGN Mechanical Upgrades
Term Contract
Results
Lewiston, NY

Boiler Repair and Maintenance
Alteration
Bidding
New York, NY

Domestic Hot Water System Alterations
Post-Bid
Castleton-on-Hudson, NY 12033

Last Updated 04/28/2022 02:47 AM
Project Title

Hartwell Hall Boiler Replacement

Physical Address View project details and contacts
City, State (County) Brockport, NY 14420   (Monroe County)
Category(s) Single Trades
Sub-Category(s) Mechanical
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $800,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Remove the existing steam generating boilers (2) and all associated components. This includes, but is not limited to: Boilers, pumps, HWS/R piping, steam and condensate piping, condensate receiver system, heat exchangers, … Provide a new boiler system with associated heat exchangers as shown on the contract drawings. Provide all associated control system and mechanical / electrical equipment tie-ins. The system must be operational by September 15th, 2022. In the event the boilers are not functional by this date, the contractor will be responsible for providing a temporary boiler system.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Heating Boilers.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents