Similar Projects
O'Reilly Auto Parts (HRO) / Hernando
New Construction, Infrastructure
Conception
$400,000 CJ est. value
Hernando, MS 38632

Silo Square - Phases 3 and 4
New Construction, Infrastructure
Design
$100,000,000 CJ est. value
Southaven, MS 38672

Silo Square - Phases 3 and 4
New Construction, Infrastructure
Design
$100,000,000 CJ est. value
Southaven, MS 38672

E911 Communications Tower
New Construction, Infrastructure
Bidding
$1,500,000 CJ est. value
Hernando, MS 38632

Hernando McIngvale Road Sidewalk Project
Infrastructure
Bidding
$190,000 CJ est. value
Hernando, MS 38632

Desoto County Hot Mix Asphalt Overlay on Various Roads
Infrastructure
Post-Bid
$2,000,000 est. value
Hernando, MS

Landers Center Expansion
Addition, Demolition, Renovation, Infrastructure - 175,000 SF
Post-Bid
$35,000,000 CJ est. value
Southaven, MS 38671

Abraham House of God
New Construction, Infrastructure
Results
$2,800,000 CJ est. value
Horn Lake, MS 38637

Getwell Road Widening
Infrastructure
Results
$12,268,000 CJ est. value
Southaven, MS 38672

Hernando High School
New Construction, Infrastructure
Construction
$85,211,000 CJ est. value
Hernando, MS 38632

Lewisburg High School Band Addition
Addition, Demolition, Infrastructure - 5,645 SF
Construction
$2,000,000 CJ est. value
Olive Branch, MS 38654

Stateline Business Park Building G
New Construction, Infrastructure - 352,800 SF
Pending Verification
$38,000,000 CJ est. value
Southaven, MS 38671

The Cascades
New Construction, Infrastructure - 400,000 SF
Pending Verification
$385,000,000 CJ est. value
Olive Branch, MS 38654

Sage Creek Phase 1 Residential
New Construction, Infrastructure
Design
$12,000,000 CJ est. value
Horn Lake, MS 38637

Water Distribution Extension for Hernando High School
Addition, Infrastructure
Bidding
$400,000 CJ est. value
Hernando, MS 38632

Last Updated 10/12/2023 10:31 PM
Project Title

Bridge Preservation on US 78 and SR 305

Physical Address View project details and contacts
City, State (County) Southaven, MS 38672   (DeSoto County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected December 2023
Bids Due View project details and contacts
Estimated Value $5,000,000 [brand] Estimate
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Bridge Preservation on US 78 & SR 305 (Bridge Nos. 2.6A, 2.6B, & 14.6) and I-22 over Musgray Road (Bridge Nos. 34.5A & 34.5B), known as Federal Aid Project Nos. NHPP-0006-01(103) / 108847301 & NHPP-0006-01(102) / 108847302 in Desoto and Marshall Counties. Project Number: NHPP-0006-01 (102) Project Completion: 259 Working Days Value Estimate Range - $1,000,000 - $5,000,000 For Federal Aid Projects the attention of bidders is directed to the contract provisions governing selection and employment of labor contained in the bid proposal. Minimum wage rates for Federal Aid Projects have been predetermined by the Secretary of Labor and are subject to Public Law 87-581, Work Hours Act of 1962, as set forth in the contract provisions. Unless otherwise set out in the bid proposal, all other projects are subject to the predetermined minimum wage rate set by the U.S. Department of Labor under the Fair Labor Standards Act. Bid Bond, Signed or Countersigned by a Mississippi Resident Agent or Qualified Non-resident Agent, With Power of Attorney Attached or on File With the Contract Administration Engineer of the Department, a Cashier's Check or Certified Check for Five (5%) Percent of Bid, Payable to State of Mississippi, Must Accompany Each Proposal. When a DBE goal is contained in the contract, the award will be contingent upon the Contractor satisfying the DBE requirements. The attention of bidders is directed to the provisions of Subsection 102.07 pertaining to irregular proposals and rejection of bids. MSDOT - 02 - Bridge Preservation on US 78 and SR 305 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents