Similar Projects
Reported | 02/15/2022 12:00 AM |
Project Title | Prune/Remove Hazardous Trees around Fort Raleigh |
Physical Address | View project details and contacts |
City, State (County) | Manteo, Raleigh, NC 27954 (Dare, Durham Counties) |
Category(s) | Single Trades |
Sub-Category(s) | Landscaping/Irrigation |
Contracting Method | Competitive Bids. |
Project Status | Request for Quotations |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | Federal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The National Park Service (NPS) Fort Raleigh National Historic Site (FORA) has a requirement to trim approximately 21 trees and remove approximately 30 trees to eliminate the potential damage from trees rubbing or falling on the housing units. Request price quote. Task 1-Pruning of Hazardous Trees: In the project areas, there are hazardous trees overhanging housing units Manteo NC. The task is to prune/trim branches from five housing units. The objective in pruning/trimming of the trees are to create a 20' clear zone in and around the housing units. Completely remove cut tree branches, limbs, sticks, leaves, and other debris that is pruned. 1.1 Follow safety guidelines as written Outer Banks Group Hazard Tree Management plan dated September 2018. Standard safety signs, cones, and flagging will be utilized to notify drivers, pedestrians, and passers-by of the pruning work. Tree work operations will comply with ANSI Z133.1 standards and applicable OSHA safety regulations. Task 2: Tree Removal: In the project areas, there are hazardous trees that are required to be removed around five housing units Manteo NC. The objective in removal of the trees is to create a 20' clear zone in and around the housing units. Completely remove tree, tree branches, limbs, sticks, leaves, and other debris that is created. Cut or grind tree stump flush to the ground from the actual sub straight, not the upheaval of the tree ensuring there is no subsurface disturbance. Score the stump with crisscross cuts not to exceed 3' apart. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |