Similar Projects
Twin Valley Road Improvements
Infrastructure
Results

Scrub Seal with Fog Seal over Asphalt Road
Infrastructure
Post-Bid
Gordon, Minong, WI 54838

CTH N Improvement
Results
Ashland, Gordon, WI

Asphalt Milling 2021
Results
Superior, WI

Hot Mix Asphalt - 2021
Post-Bid
Superior, WI

2021 CDBG and CIP Sidewalk Replacement
Results
Superior, WI

Airport Surfacing
Results
Brookfield, Janesville, Lancaster, Tomah, Waukesha, Wausau, Woodruff, WI 53072

Asphalt Milling 2022
Infrastructure
Post-Bid
$400,000 est. value
Superior, WI

Poly Fiber Flex Patch
Infrastructure
Post-Bid
Gordon, Minong, WI 54859

2022-23 Blacktop Resurfacing - Hot Mix Bond Leader Lake Road to Leader Lake Road
Infrastructure
Post-Bid
Minong, WI 54859

Blacktop Surfacing - Warm Mix Asphalt - 2022
Infrastructure
Post-Bid
Minong, WI 54859

Minong - Solon Springs, CTH M - Wis. Central Ltd. RR
Infrastructure
Bidding
$5,000,000 to $6,000,000 est. value
Poplar, WI

Brule - Ino, Sznaider Road to CTH A; Wentworth - Ino, Clevedon Road to Sznaider Road;
Infrastructure
Results
$100,000 est. value

Statewide Pavement Maintenance 2021-2022
Term Contract
Results
Less than $5,000 est. value

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

Reported 05/24/2022 12:00 AM
Project Title

Blacktop Resurfacing-Hot Mix on South Mail Road

Physical Address View project details and contacts
City, State (County) Gordon, WI 54838   (Douglas County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected July 2022
Bids Due View project details and contacts
Estimated Value $800,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Invitation to Bid Town of Wascott Douglas County, Wi the Town of Wascott, Douglas County, Is Accepting Sealed Bids for Blacktop Resurfacing-hot Mix, on South Mail Road. This is an tris/lrip project work to be provided will consist of blacktop resurfacing of hot mix asphalt with 3' gravel shoulders and pulverizing of existing blacktop.The Town of Wascott reserves the right to accept or reject any or all bids or any part(s) thereof, waive any informalities in the bidding process, and to accept the bid proposal or portion of a bid proposal deemed most advantageous to the Town.For further information please contact Jason Walters, Highway Foreman, by calling 715/296-6875.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents