Similar Projects
Anderson Park Pool Skimmer, Line, and Leak Repair
Infrastructure
Sub-Bidding
$150,746 CJ est. value
Wheat Ridge, CO 80033

Westlake Park Irrigation Pump Station Component Replacement
Infrastructure
Sub-Bidding
$51,000 CJ est. value
Grand Junction, CO 81505

Pasquale Springs Water Treatment Plant Improvement Project
Infrastructure
Post-Bid
$300,000 CJ est. value
Salida, CO 81201

Shower Panel Replacement
Alteration
Post-Bid
$200,000 est. value
Pueblo, CO 81003

Hatch House Plumbing Replacement
Renovation
Results
$171,389 CJ est. value
Pitkin, CO 81241

Correct Shower Floors for Drainage
Alteration
Results
$250,000 to $500,000 est. value
Aurora, CO 80045

Rio Blanco Outlet Rehabilitation
Infrastructure
Construction
$265,888 CJ est. value
Meeker, CO 81641

Westlake Park Irrigation Main Line Replacement
Infrastructure
Sub-Bidding
$500,000 CJ est. value
Grand Junction, CO 81501

83 Tub Liner / Shower Surround Installations
Term Contract
Post-Bid
$110,000 est. value
Denver, CO 80221

As-Needed HVAC, Plumbing and Mechanical Services
Term Contract
Results
Aspen, CO

The Caf Heat Pump Replacement
Renovation
Sub-Bidding
$138,000 CJ est. value
Grand Junction, CO 81501

Cherrywood Park Drainage Improvements
Demolition, Infrastructure
Post-Bid
$500,000 CJ est. value
Thornton, CO 80602

Replace Plumbing Abate Asbestos Centennial Building
Demolition, Alteration
Results
Denver, CO 80203

Bus Wash Heater Replacement
Alteration
Post-Bid
$100,000 est. value
Frisco, CO

Allenspark Vault Toilet
Alteration
Results
CO

Last Updated 10/09/2023 10:03 AM
Project Title

RFP D/B - Pueblo Water - Design-build Serv - Construct 16-" Main Crossing E. Hwy. 50

Physical Address View project details and contacts
City, State (County) Pueblo, CO 81001   (Pueblo County)
Category(s) Single Trades
Sub-Category(s) Plumbing
Contracting Method Design-Build Firm to Subcontract, Competitive Bids
Project Status Bidding, Construction start expected September 2023 , Request For Proposals
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Reference Number 0000325518 This Request for Proposal (RFP) is intended to be used to select a Design Build Team (DB Team) for the design and construction of the Proposed 16" Potable Water Transmission Main Crossing at E. Highway 50 near E. 12th Street in Pueblo, Colorado. Question Acceptance Deadline 07/27/2023 at 4:30 PM MT Questions are submitted online Yes General Requirements - Bidder Prequalification/Preregistration Required - FOB Destination - Insurance Required - License Required Award Requirements - All or None Award Background: This Request for Proposal (RFP) is intended to be used to select a Design Build Team (DB Team) for the design and construction of the Proposed 16" Potable Water Transmission Main Crossing at E. Highway 50 near E. 12th Street in Pueblo, Colorado. B. Overview: An Arkansas Valley Conduit (AVC) Delivery Pressure Evaluation report from June 2020 identified 4 pipe segments in the Pueblo Colorado vicinity that would incrementally increase pipeline delivery capacity near 36th Lane and E. US HWY 50 (Connection Point to AVC). This 16" Transmission Main addition is required as a component of the required improvements to meet the 3.2 MGD demand capacity at the Connection Point. C. Goals: Design and Construction 16" a potable water main crossing of E. US Hwy. 50 from the intersection of York St./E. 12th St. to a connection with a 20" main, along the north side of and within the R.O.W. of E. Hwy. 50. SECTION II. - Statement of Work A. Description of the Project: The DB Team will successfully and safely complete the engineering and construction of the 16" transmission main that will cross under an adjacent arroyo and E. US Highway 50. This should be accomplished according to a managed schedule; in accordance with the project's permitting requirements; and with the highest quality design and construction - all while providing the best possible value to Pueblo Water. The chosen DB Team will be responsible for all activities necessary within their project approach to evaluate existing dimensions and conditions of the existing facilities, formulate a design, and construct the approved designed features. At a minimum, the project approach shall address the following: o Evaluation of installation methodology, i.e., open-cut, directional drill, and/or horizontal bore that will ensure best cost, protection, and longevity of the pipeline. o Assist Pueblo Water with securing necessary easements outside Rights of Way. o Design of pipe crossing and appropriate "tie" in points, North and South of crossing. Include Technical Specifications, Erosion Control Plans, etc., needed for a full working set of construction plans and documents. o Design of any necessary pipe protection features. The listed specifications, terms, and conditions to be discrepant, incomplete, or otherwise questionable in any respect, it shall be the responsibility of the concerned party to notify the Procurement Specialist of such matters imme

Details

Division 22 - Plumbing, Common Work Results for Plumbing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents