Similar Projects
2020 Concrete Rehab-Ada Improvements
Post-Bid
$370,000 to $390,000 est. value
Wheat Ridge, CO

W-Line Shared Use Path - Oak to Kipling and Zephyr to Wadsworth
Post-Bid
Lakewood, CO 80228

Concrete ADA Compliant Ramps at Campbell Cottages
Term Contract
Results
Arvada, CO 80005

Parking Lot Maintenance
Results
Golden, CO 80401

Pierce and 17th Avenue Crosswalk
Post-Bid
Lakewood, CO 80226

Signal Replacement with Curb Ramps and Minor Signing and Striping
Results
$1,000,000 to $5,000,000 est. value

Sidewalk Improvements on 13th Avenue (Lamar Street West) and Wadsworth Boulevard (Mansfield Avenue South)
Post-Bid
Lakewood, CO 80226

Union and 6th Avenue On-Ramp Median Reconstruction
Results
Lakewood, CO 80226

Climbing Access Trail Construction
Post-Bid
CO

West 50th Avenue Sidewalk (SRTS) Between Fairmount Elementary & Mcintyre Street
Results
Golden, CO 80419

2021 Concrete Rehab-Ada Improvements
Post-Bid
$200,000 to $250,000 est. value
Wheat Ridge, CO

Open Space North 40 Parking Lot Asphalt Replacement
Term Contract
Results
Less than $50,000 est. value
Golden, CO 80401

Sidewalk Elevation Differential Mitigation (Sawing)
Post-Bid
Lakewood, CO

2020 Safe Routes to School - Pierce Street Project
Results
$300,000 to $350,000 est. value
Edgewater, CO 80214

Ada Curb Ramp Upgrades
Results
$1,000,000 to $5,000,000 est. value

Reported 10/01/2020 12:00 AM
Project Title

Improvements of Walkways, Curbs, Trails and Parking Lots at Five Parks

Physical Address View project details and contacts
City, State (County) Evergreen, CO 80439   (Jefferson County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The scope of work: Parking Lot Project, encompasses shallow excavation work, ADA ramps and railings, milling, paving, sealcoat, crack seal, and flatwork to repair parking lots, trails, paths and ramps at 5 different sites. This includes approximately 9790 sf of concrete and 3835 sy of paving. Alternates include addition path and trail repair, walks, and pavement repair. Selected Respondent and all subcontractors shall conform to all applicable building codes, and shall secure all necessary building permits for the project. The project locations are: 1. Buchanan Park Recreation Center, 32003 Ellingwood Trail, Evergreen, CO 80439, 2. Wulf Recreation Center, 5300 S Olive Road, Evergreen, CO 80439. 3. Arrowhead Park, Evergreen, CO 80439, Kittridge Park, Kittridge, CO 80439 and 4. Marshdale Park, Evergreen, CO 80439

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents