Similar Projects
Tyson Avenue Mixed Use Development
New Construction - 32 SF
Conception
$237,300,000 est. value
Tampa, FL 33611

Reverse Osmosis Plant at Reservoir #2 - 96767 - City of Clearwater
Addition, Demolition, Renovation, Infrastructure
Conception
$8,975,000 CJ est. value
Clearwater, FL 33755

Schooner Resort Hotel
New Construction, Build-Out, Demolition
Design
Madeira Beach, FL

The Moxy
New Construction, Renovation - 16,500 SF
Design
$5,000,000 to $10,000,000 CJ est. value
Saint Petersburg, FL 33705

Seminole Square Apartments
New Construction, Infrastructure - 90,610 SF
Bidding
$13,000,000 CJ est. value
Largo, FL 33778

David Levia and Melissa Schemkes
Infrastructure
Bidding
$200,000 CJ est. value
Largo, FL 33770

Paradise Trail Northern Swale Project
Infrastructure
Sub-Bidding
$50,000 CJ est. value
Clearwater, FL 33755

Tropical Smoothie Cafe #338
Build-Out - 1,560 SF
Post-Bid
Saint Petersburg, FL 33711

Honda Clearwater
Renovation, Addition
Post-Bid
Clearwater, FL 33764

Downtown Clearwater Waterfront Development Opportunities - Imagine Clearwater
Results
$65,000,000 est. value
Clearwater, FL 33755

115 South MLK JR Site Development
Results
Clearwater, FL 33756

Olive Garden #1032
Renovation - 9,098 SF
Construction
$350,000 est. value
Clearwater, FL 33761

Bert Smith Porsche
New Construction
Construction
Largo, FL 33771

Sesh
Renovation
Pending Verification
Saint Petersburg, FL 33704

Circle K
New Construction - 5,200 SF
Pending Verification
Clearwater, FL

Last Updated 08/17/2022 03:33 PM
Project Title

7-Eleven #26894 / Largo

Physical Address View project details and contacts
City, State (County) Clearwater, FL 33760   (Pinellas County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Food/Beverage Service, Gas Station, Site Development, Vehicle Sales/Service
Contracting Method Bids by Invitation
Project Status Construction start expected June 2022
Bids Due View project details and contacts
Estimated Value $2,000,000 [brand] Estimate
Plans Available from General Contractor
Owner View project details and contacts
Architect View project details and contacts
Description

Plans call for the construction of a convenience store and fueling center. Construction is underway. All subcontractor trades have been closed.

Details

1 Story Above Grade, 3,611 SF.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Concrete Finishing.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Panel Doors, Entrances and Storefronts, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Acoustical Ceilings, Resilient Flooring, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 11 - Equipment, Vehicle Service Equipment, Vehicle-Washing Equipment, Refrigerated Display Equipment, Foodservice Equipment, Foodservice Storage Equipment, Refrigerated Food Storage Cases, Walk-In Coolers, Foodservice Shelving, Food Cooking Equipment, Food Dispensing Equipment, Soda Fountain Equipment, Ice Machines, Cleaning and Disposal Equipment.
Division 12 - Furnishings, Countertops, Furnishing Accessories, Waste Receptacles, Rugs and Mats, Entrance Floor Mats and Frames, Site Furnishings, Trash and Litter Receptacles.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers, Drinking Fountains.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Screening Devices, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Division 44 - Pollution and Waste Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents