Similar Projects
Reiman Road over Cedar Creek - Replacement - Ottawa County
Demolition, New Construction, Infrastructure
Conception
$500,000 CJ est. value
Millbury, OH 43447

O'Reilly Auto Parts (RFD) / Rossford
New Construction, Infrastructure
Conception
$400,000 CJ est. value
Rossford, OH 43460

Roche De Boeuf Interurban - Bridge Inspection
Infrastructure, Renovation
Design
$2,450,000 CJ est. value
Bowling Green, OH 43402

BG Lab Exhaust UPS Project
Infrastructure
Bidding
$502,000 CJ est. value
Bowling Green, OH 43402

Major Reconstruction - IR 280
Infrastructure
Bidding
$11,287,200 CJ est. value
Millbury, OH 43447

New Municipal Building - City of Perrysburg
Demolition, New Construction, Infrastructure
Post-Bid
$6,000,000 CJ est. value
Perrysburg, OH 43551

Wood County Jail Expansion and Renovation - RFQ for Detention Equipment & Secured Electronics
Addition, Demolition, Renovation, Infrastructure
Post-Bid
$19,806,750 CJ est. value
Bowling Green, OH 43402

WOO Napoleon Road Roundabout
Infrastructure
Results
$1,162,811 CJ est. value
Bowling Green, OH 43402

Replacement of Rudolph Road Bridge No. 5-133D over Ditch 2267
Demolition, New Construction, Infrastructure
Results
$336,352 CJ est. value
Bowling Green, OH 43402

JC Reuthinger Memorial Preserve Expansion and Addition - Wood County
Addition, Infrastructure
Pending Verification
$130,000 CJ est. value
Perrysburg, OH 43551

Perrysburg Township Administration Building
New Construction, Renovation, Infrastructure - 8,031 SF
Pending Verification
$2,000,000 CJ est. value
Perrysburg, OH 43551

Noise Wall
Infrastructure
Conception
$700,000 CJ est. value
Bowling Green, OH 43402

2023 Starbright Area Sewer Rehabilitation
Infrastructure
Bidding
$400,000 CJ est. value
Bowling Green, OH 43402

Bowling Green State University Advanced Manufacturing & Engineering Building
New Construction, Infrastructure - 84,000 SF
Post-Bid
$30,000,000 CJ est. value
Bowling Green, OH 43402

Replacement of Long Judson Road Bridge No. 4-79C over Ditch 2426
Demolition, New Construction, Infrastructure
Results
$385,134 CJ est. value
Plain Township, OH 43402

Last Updated 10/18/2023 09:34 AM
Project Title

Back Bay Pump Station Rehabilitation

Physical Address View project details and contacts
City, State (County) Bowling Green, OH 43402   (Wood County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected November 2023
Bids Due View project details and contacts
Estimated Value $358,300 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

In general, the work consists of the replacement of the existing Back Bay Pump Station with a new wet well including new pumps, controls, and prepackaged valve kit and site work. Technical questions regarding the project should be e-mailed to the Project Manager Theodore Bennett, P.E. at tbennett@jheng.com at Jones & Henry Engineers, Ltd. Neither Owner nor Engineer has any responsibility for the accuracy, Completeness or sufficiency of any bid documents obtained from any source other than the source indicated in these documents. Obtaining these documents from any other source(s) may result in obtaining incomplete and inaccurate information. Obtaining these documents from any source other than directly from the source listed herein may also result to receive any addenda, corrections, or other revisions to these documents that may be issued. Bids must be submitted on the forms bound herein, must contain the names of every person or company interested therein, and shall be accompanied by either a Bid Guaranty and Contract Bond in the amount of 100% of the amount bid with satisfactory corporate surety, or by a certified check on a solvent bank in the amount of not less than 10% of the amount of the bid, subject to conditions provided in the Instructions to Bidders. The successful bidder will be required to furnish satisfactory Performance bond and Maintenance and Guarantee Bond in the amount of 100% of the bid. The Contractor shell be required to pay not less than the prevailing state wage rates established by the Ohio Bureau of Employment Services, Wage and Hour Division. Any Bid may be withdrawn prior to the scheduled closing time for receipt of Bids, but no bidder shall withdraw his bid within 90 days after the actual opening thereof. Question Deadline 10/24/2023. All questions shall be submitted by e-mail to Theodore Bennett, P.E. at Jones & Henry Engineers, Ltd. at 3103 Executive Parkway, Suite 300, Toledo, OH 43606, tbennett@jheng.com. All questions about the meaning or intent of the Bidding Documents are to be submitted to Engineer in Writing. Interpretations or clarifications considered necessary by Engineer in response to such questions will be issued by Addenda delivered to all parties recorded as having received the Bidding Documents. Questions after the established in the Instructions to Bidders may not be answered. Only questions answered by Addenda will be binding. Oral and other interpretations or clarifications will be without legal effect. Addenda may be issued to clarify, correct, supplement, or change the Bidding Documents. The Engineer's Opinion of Probable Construction Costs is $358,300.00 The Work will be substantially completed within 240 days after the date when the contract times commence to run as provided in the General Conditions, and Completed and ready for final payment in accordance in General conditions within 270 days after the date when the Contract Times Commence to run.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents