Similar Projects
Life Sciences Building
New Construction - 190,000 SF
Conception
$10,000,000 CJ est. value
San Carlos, CA 94070

Margate Park Improvements - City of Daly City
Infrastructure
Conception
$5,000,000 est. value
Daly City, CA 94015

435 East 3rd Avenue Mixed-Use Development
Demolition, New Construction, Infrastructure - 33,876 SF
Design
$9,000,000 CJ est. value
San Mateo, CA 94401

ACLS - Millbrae
New Construction, Demolition - 244,662 SF
Design
$10,000,000 CJ est. value
Millbrae, CA 94030

Bayfront Park Sanitary Sewer Improvement
Infrastructure
Bidding
$3,642,388 CJ est. value
Menlo Park, CA 94025

Replace Culvert, Drainage and Erosion Control
Infrastructure
Bidding
$18,000,000 CJ est. value
Belmont, CA 94002

Positive Location of Underground Utility Facility (Potholing) Services
Infrastructure
Post-Bid
$1,400,000 est. value

Replacement of 8-Inch Pipeline Under Pilarcitos Creek (Strawflower) Project
Alteration
Post-Bid
$372,000 est. value
Half Moon Bay, CA 94019

Hopkins Avenue Traffic Calming Project
Alteration
Results
$4,250,000 to $4,680,000 est. value
Redwood City, CA

Bowditch Middle School New Drama and Science Buildings
New Construction, Infrastructure
Results
$15,903,000 CJ est. value
Foster City, CA 94404

South ECR WMR, Phase 1 Sanchez to Barroilhet - City of Burlingame
Infrastructure
Construction
$5,113,000 est. value
Burlingame, CA

Gateway of Pacific Phase 4
Demolition, New Construction, Infrastructure - 345,842 SF
Pending Verification
$88,000,000 CJ est. value
South San Francisco, CA 94080

222 Gateway Terrace Condominiums
Demolition, New Construction, Infrastructure - 54,445 SF
Pending Verification
$15,000,000 CJ est. value
San Mateo, CA 94401

Town Square - City of Burlingame
New Construction, Infrastructure
Conception
$5,500,000 CJ est. value
Burlingame, CA 94010

1699 - 1701 Old Bayshore Highway
New Construction, Demolition - 482,180 SF
Design
$10,000,000 CJ est. value
Burlingame, CA 94010

Last Updated 10/03/2022 12:01 PM
Project Title

MBC BioLabs / San Carlos

Physical Address View project details and contacts
City, State (County) San Carlos, CA 94070   (San Mateo County)
Category(s) Heavy and Highway, Laboratory
Sub-Category(s) Laboratory, Site Development
Contracting Method Bids by Invitation
Project Status Construction Commenced, Construction start expected July 2022
Bids Due View project details and contacts
Estimated Value $40,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Plans call for the construction of a life sciences building. As of September 30, 2022, a general contractor has been identified and a building permit was issued on June 27, 2022. *This project has been awarded and all trades have been let.

Details

3 Stories Above Grade, 152,582 SF.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings, Doors and Frames, Windows, Vents.
Division 09 - Finishes, Tiling, Flooring, Resilient Flooring, Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings, Specialty Casework, Laboratory Casework, Countertops, Laboratory Countertops, Institutional Furniture, Laboratory Furniture.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Plumbing Equipment, Drinking Fountains and Water Coolers, Gas and Vacuum Systems for Laboratory and Healthcare Facilities, Compressed-Air Systems for Laboratory and Healthcare Facilities, Vacuum Systems for Laboratory and Healthcare Facilities, Gas Systems for Laboratory and Healthcare Facilities, Chemical-Waste Systems for Laboratory and Healthcare Facilities, Processed Water Systems for Laboratory and Healthcare Facilities.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, HVAC Fans, Central HVAC Equipment.
Division 26 - Electrical, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents