Similar Projects
Grading
Infrastructure
Bidding
$3,159,800 est. value
FL

SNL Infrastructure Construction and Maintenance
Infrastructure
Post-Bid

KCS NASA Causeway Shoreline Repairs
Term Contract
Post-Bid
$1,000,000 to $5,000,000 est. value

South Ditch Rehabilitation
Results
Tampa, FL 33622

Drainage Facility Improvements and Drainage Repairs
Results
Less than $1,631,929 est. value
FL

Parking Lot Drainage Project, Raymond James Stadium
Results
Tampa, FL 33607

Rental and Installation of Temporary Cofferdam at Mcmullen Loop
Results
Tampa, FL 33601

Drainage Project at Sulphur Springs Elementary School
Results
Tampa, FL 33604

Drainage Project at Carrollwood Elementary School
Results
Carrollwood, FL 33618

Stormwater Pond Maintenance
Results

District-Wide Maintenance of Mitigation Sites and Stormwater Ponds
Results

Drainage Improvement Project (Chamberlain High School)
Results
Tampa, FL 33612

Construction Services of Roadside Ditch, Canal Cleaning, and Grading Projects
Results
Less than $15,200,000 est. value
Tampa, FL 33601

Stormwater Culverts Construction Contract
Results
$6,500,000 est. value
FL

Pipe Cleaning Drainage Systems
Results
Less than $65,000 est. value
FL

Last Updated 07/19/2021 04:19 AM
Project Title

Drainage In Field Corridors, Tournament Sportsplex

Physical Address View project details and contacts
City, State (County) Tampa, FL 33619   (Hillsborough County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Locate existing flat 12-inch drainage that is on 15-foot centers. Layout trenches parallel to existing drainage on 20-foot centers. Sod cut at a depth of 1 ¾ in. removed to the side of the trench to be reinstalled at the end of construction. Trench shall be a minimum of 9 inches wide and 15 inches deep. Rock bed shall be washed 89 granite stone of a minimum depth of 9 inches the bottom of which shall produce a constant grade of not less than 0.5 % slope. Trench shall be filled with ¾ inch layer of gravel on the bottom, then install 4 inches N12 ADS pipe in the center of the trench. Then, backfill with a minimum of 9 inches of gravel. Install 90/10 root zone mix on top of the gravel, maximum depth of 6 inches, then compact with plate compactor, level, and reinstall sod. The outfall of the 4-inch N12 pipe will be connected to the existing 6-inch N12 pipe running along the sideline of the field.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents