Similar Projects
Sunbelt Sports Park (4 Ball Field/ Soccer Complex) - City of Kingman
New Construction
Conception
$7,273,758 est. value
Kingman, AZ

Downtown Infrastructure Project - City of Kingman
Infrastructure
Conception
$7,147,082 est. value
Kingman, AZ 86401

Design-Build Services for Aluminum Dross Remediation at the Kingman Municipal Airport
New Construction, Infrastructure
Design
$30,000,000 CJ est. value
Kingman, AZ 86401

Police Department Fueling Facility
Infrastructure
Bidding
$435,000 CJ est. value
Lake Havasu City, AZ 86403

Laughlin/Bullhead International Airport - Replace Apron Security Lighting Project
Infrastructure
Bidding
$600,000 CJ est. value
Bullhead City, AZ 86429

Box Canyon Excavating of 3 House Pads
Infrastructure
Post-Bid
Peach Springs, AZ

Kaibab Playground Equipment Installation
New Construction
Post-Bid
Kaibab, AZ 86022

Animal Shelter Trenching
Infrastructure
Results
Kingman, AZ 86409

Runway 14-32 Rehabilitation Project
Infrastructure
Results
$5,880,000 CJ est. value
Lake Havasu City, AZ 86404

Nucor Melt Shop Facility
New Construction, Infrastructure
Pending Verification
$100,000,000 CJ est. value
Kingman, AZ 86401

Trails at Black Mountain
New Construction, Infrastructure
Pending Verification
$80,000,000 CJ est. value
Bullhead City, AZ 86442

Kingman Airport Dross Site Cleanup - City of Kingman
Infrastructure
Conception
$30,000,000 CJ est. value
Kingman, AZ 86401

Centennial Park Exploration Drilling Project
Infrastructure
Bidding
$650,000 CJ est. value
Kingman, AZ 86409

Replace Courtesy Dock at Hemenway Harbor Lake Mead National Recreation Area
Infrastructure
Post-Bid
$500,000 CJ est. value
Willow Beach, AZ 86445

Exploratory Soil Borings
Infrastructure
Results
$563,100 CJ est. value
Bullhead City, AZ 86429

Last Updated 08/08/2022 02:53 AM
Project Title

Dick Samp Park Pickleball Courts - Phase 3

Physical Address View project details and contacts
City, State (County) Lake Havasu City, AZ 86404   (Mohave County)
Category(s) Heavy and Highway
Sub-Category(s) Park/Playground, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected July 2022
Bids Due View project details and contacts
Estimated Value $96,117 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The Project consists of the phase 3 improvements to Dick Samp Park based on recommendations in the Field Assessment Report and the Dick Samp Park Master Plan prepared by Shepard Wesnitzer and Norris Design. Phase 3 improvements include 4 new Pickleball courts on one post-tension slab with hardscape and fencing. QUESTIONS: All questions that arise relating to this solicitation shall be directed in writing to purchasing@lhcaz.gov . To be considered, written inquiries shall be received at the above-referenced email address by Friday, June 10 th , 2022, end of day. Inquiries received will then be answered in an Addendum. Bids must be submitted in a sealed envelope with the Project Number and the bidders name and address clearly indicated on the envelope. All bids must be completed in ink or typewritten on a form to be obtained from the specifications and a complete Invitation for Bid returned along with the offer no later than the time and date cited above. BONDS: Bid Bond 10% Labor and Material Bond: 100% Faithful Performance Bond: 100% Project Completion Date: 120 calendar days after Notice to Proceed. Lake Havasu City reserves the right to accept or reject any or all bids or any part thereof and waive informalities deemed in the best interest of the City.

Details

Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.
Division 31 - Earthwork, Selective Clearing, Grading.
Division 32 - Exterior Improvements, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents