Similar Projects
Construct A Private Water Well In Ashland Va (2022-Cr-02)
Infrastructure
Bidding
$40,000 est. value
Ashland, VA 23005

Installation of III-B Well and Abandoned Existing Drilled Well
Infrastructure
Bidding
$9,000 est. value
Amelia Court House, VA 23002

Scroll Vacuum Pump
Post-Bid
Norfolk, VA

Pump Maintenance, Repair Services, Parts and Equipment
Post-Bid
Norfolk, VA

Self Priming Water Pump
Results
Staunton, VA 24401

Manhole and Wet Well Rehabilitation and Related Services
Term Contract
Results
VA

Construct a Private Water Well
Infrastructure
Bidding
$210,000 est. value
Lancaster, VA 22503

Construction of Town Center Fountains Pump Replacement
Post-Bid
Virginia Beach, VA

Pumps, Centrifugal and Circulating for Keen Mountain Correctional Center
Results
Oakwood, Richmond, VA 24631

Septic and Well Assistance Program - Service Providers
Infrastructure
Bidding
Richmond, VA

Water Pump Test Stand HMI Installation & Configuration
Post-Bid
Portsmouth, VA 23709

Pump and Haul Services
Results
Norfolk, VA

Well Abandonment
Infrastructure
Bidding
$400,000 est. value
Victoria, VA 23974

Manassas Water Treatment Plant Clearwell No 2
Infrastructure
Post-Bid
Nokesville, VA 20181

Irrigation Well Replacement at Christopher Newport University
Results
Newport News, VA

Last Updated 06/29/2022 02:36 PM
Project Title

Selma Estates Finished Water Booster Pump Upgrades

Physical Address View project details and contacts
City, State (County) Leesburg, VA 20176   (Loudoun County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from County Agency - 03/16/22
Owner View project details and contacts
Architect View project details and contacts
Description

Demolition of one existing 40HP booster pump and VFD - Installation of two new 20HP booster pumps and VFDs - Electrical and I&C work as needed to facilitate the pump upgrades.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents