Similar Projects
Rock Quarry Landing
New Construction
Design
$34,000,000 est. value
Raleigh, NC

The Commons of Forsyth County Preschool
New Construction, Renovation
Design
Winston-Salem, NC 27101

Tall Glass of Water - Phase I
Infrastructure
Bidding
$750,000 est. value
Windsor, NC

Lett Park Ballfield Infield Clay and Grading
Renovation
Bidding
Broadway, NC 27505

Tennis Court Repairs at Scott Northern Wake Campus
Post-Bid
Raleigh, NC 27603

Playground Equipment
Post-Bid
Morrisville, NC 27560

Running Track Resurfacing
Results
Less than $739,700 est. value
Cullowhee, NC

Randolph Johnson Park Improvements
Results
Beaufort, NC

Woodfield Landing
New Construction
Construction
$13,500,000 est. value
Havelock, NC

Athletic Improvements at West Brunswick High School
Construction
Shallotte, NC 28470

North Carolina Freedom Park
New Construction
Pending Verification
$3,000,000 est. value
Raleigh, NC 27601

Dorothea Dix Park Gateway Plaza and Play
Design
Less than $34,000,000 est. value
Raleigh, NC 27601

Dallas Park Splash Pad
Renovation
Bidding
Gastonia, NC

2020 Poured in Place Surface Replacement at Method Community Park Playground
Post-Bid
Raleigh, NC 27601

Bolton Park Playground Renovations
Results
Winston-Salem, NC 27103

Last Updated 10/25/2021 11:56 AM
Project Title

Liberty Park Phase 2

Physical Address View project details and contacts
City, State (County) Mooresville, NC   (Iredell County)
Category(s) Heavy and Highway
Sub-Category(s) Park/Playground
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project will include but not limited to site clearing, demolition, grading, asphalt and concrete paving and striping, drainage, retaining walls, water and sewer utilities, building systems including but not limited to foundations, structural steel, roofing, electrical, plumbing, mechanical, and fire protection systems , pergola structure with swings, playground equipment and play surfacing, an interactive fountain, pole lighting, fencing, site furnishings, landscape and signage.

Details

Park/Playground, New Construction.
Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 31 - Earthwork, Selective Clearing, Grading.
Division 32 - Exterior Improvements, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents