Similar Projects
Burma Drive Extension
Bidding
Apex, NC

Milling, Resurfacing and Shoulder Grading
Bidding
NC

Wake Forest Road/Blount Street/Person Street Phase I Improvements
Post-Bid
Raleigh, NC

Ligon Mill Road Improvements
Post-Bid
Wake Forest, NC

Optional Industry Forum and DBE Outreach Session
Results
Less than $2,200,000,000 est. value

Triangle Expressway Southeast Extension, NC 55 Bypass to East of Pierce Olive Road
Results
NC

Five County Stadium Approach and Entry + Restroom Renovations
Renovation
Construction
Less than $1,529,432 est. value
Zebulon, NC 27597

Shelley Lake Park Comfort Station
Construction
Less than $567,611 est. value
Raleigh, NC 27604

AST Paving and Resurfacing Project
Post-Bid
Raleigh, NC

Wake County Park Renovations at Harris Lake and Crowder County Parks
Results
Less than $117,916 est. value
New Hill, NC

International Drive Pavement Rehabilitation
Post-Bid
Less than $5,000,000 est. value
Morrisville, NC 27560

2019 Pavement Preservation
Results
$100,000 to $250,000 est. value
NC

Park Depot Greenway
Post-Bid
Fuquay-Varina, NC

Yonkers Road Improvements
Results
Less than $10,000,000 est. value
Raleigh, NC

Tryon Road Part C Widening Project
Post-Bid
Raleigh, NC

Last Updated 12/16/2020 09:16 AM
Project Title

Brentwood Park Phase I Renovations

Physical Address View project details and contacts
City, State (County) Raleigh, NC 27604   (Wake County)
Category(s) Entertainment/Recreation, Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Restroom/Bath House
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,263,790
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project includes the renovation of an existing City of Raleigh Park and the project scope as defined by the project documents includes: • Demolition or resurfacing of the existing asphalt parking lot, demolition of walkways and restroom/concession building. • New work including parking area striping, stormwater, utilities, sidewalk to Brentwood Road, internal sidewalks, stairs and handrails, • Comfort station/picnic shelter and related structural, mechanical, electrical, and plumbing services, • Site electrical, Existing light pole removal and new light pole installation by others. • Play area subgrade preparation and drainage for poured-in-place playground surfacing (by others), • Concrete edging, planting and seeding as well as other Work indicated in the Contract Documents. • Playground surfacing and equipment to be installed by others.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 02 - Existing Conditions, Demolition.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 09 - Finishes, Painting.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Exterior Lighting.
Division 31 - Earthwork, Selective Clearing, Grading.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents